Funding Organization
National Aeronautics and Space Administration
340 opportunities
About
No description available for this funder.
Contracts (338)
RISK REDUCTION AND PHASE B EFFORT IN SUPPORT OF THE MARS ATMOSPHERIC AND VOLATILE EVOLUATION (MAVEN) PROJECT. THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE MAVEN PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM, WHICH CONSISTS OF THE INTEGRATED SPACECRAFT AND SCIENCE PAYLOADS IN ACCORDANCE WITH THE STATEMENT OF WORK.
openSep 30, 2026Up to $300,980,000
EXTRAVEHICULAR ACTIVITY (EVA) DEMONSTRATION
openAug 9, 2028Up to $93,160,000
DEEP SPACE OPTICAL COMMUNICATIONS (DSOC) FLIGHT TERMINAL PROJECT THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJ
openJan 31, 2027Up to $134,440,000
SPACE WEATHER FOLLOW ON - LAGRANGE 1 (SWFO-L1) SPACECRAFT
openJun 30, 2026Up to $104,050,000
TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS.
openMay 31, 2027Up to $108,700,000
RESEARCH AND ANALYSIS (R&A), EARTH SCIENCE, CLIMATE VARIABILITY AND CHANGE
openSep 24, 2028Up to $108,920,000
PLANETARY SCIENCE PROGRAM SUPPORT 40-15961
openSep 26, 2027Up to $106,910,000
KENNEDY EXPLORATION GROUND SYSTEMS (EGS) PROGRAM (LX) SUPPORT SERVICES CONTRACT THREE (KLXS III).
openSep 30, 2026Up to $111,280,000
EMIT (EARTH SURFACE MINERAL DUST SOURCE INVESTIGATION) THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPON
openSep 30, 2028Up to $109,210,000
COMMERCIAL LUNAR PAYLOAD SERVICES (CLPS) TASK ORDER CS-3
openAug 31, 2027Up to $112,770,000
PLANETARY SCIENCE DIVISION, CONCEPT STUDIES FOR PLANETARY INSTRUMENTS
openSep 30, 2028Up to $114,070,000
IGF::CL::IGF IMAGING X-RAY POLARIMETRY EXPLORER (IXPE) PHASE A
openJan 31, 2027Up to $116,280,000
THE COMPTON SPECTROMETER AND IMAGER (COSI)
openSep 30, 2027Up to $117,730,000
NASA HEADQUARTERS (HQ) MANAGES THE MARS EXPLORATION PROGRAM (MEP), WHICH SELECTED THE MARS ATMOSPHERE AND VOLATILE EVOLUTION (MAVEN) PROJECT AS A MARS SCOUT MISSION. THE MAVEN PRINCIPAL INVESTIGATOR (PI) IS DR. BRUCE JAKOSKY, OF THE UNIVERSITY OF COLORADO, LABORATORY FOR ATMOSPHERIC AND SPACE PHYSICS (LASP) IN BOULDER, CO. THE PI WILL HAVE OVERALL CONTROL OF THE MAVEN PROJECT. HE WILL PROVIDE SCIENCE LEADERSHIP FOR THE MAVEN MISSION AND MANAGE EDUCATION AND PUBLIC OUTREACH. THIS EFFORT APPLIES TO LASP AND COVERS PHASES A, B, C, D, AND E OF THE MAVEN MISSION. UNDER PHASE A OF THIS CONTRACT, THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULE MANAGEMENT, PROVIDING TECHNICAL PROGRESS REPORTS, AND MISSION REVIEWS. UNDER PHASE B, THE CONTRACTOR IS RESPONSIBLE FOR SUPPORTING REQUIREMENTS ANALYSIS, PROJECT PLANS, PRELIMINARY DESIGN REVIEWS, MONTHLY STATUS REVIEWS, QUARTERLY TEAM MEETINGS, E/PO ACTIVITIES, AND THE PRELIMINARY SCIENCE DATA MANAGEMENT PLAN. UNDER PHASES C AND D, THE CONTRACTOR IS RESPONS
openJan 31, 2029Up to $117,280,000
HHPC2 TO
openSep 30, 2026Up to $117,450,000
DRAGONFLY RELOADABLE LANDER TO EXPLORE TITAN'S PREBIOTIC CHEMISTRY AND HABITABILITY ANNOUNCEMENT OF OPPORTUNITY NNH16ZD011O
openFeb 19, 2027Up to $116,470,000
JPL CONTRIBUTIONS TO ENVISION 42-711260
openJun 28, 2026Up to $125,730,000
GAMMA RAY LARGE AREA SPACE TELESCOPE (GLAST). THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPORTING NASA REVIEWS&DIRECTED ENGINEERING ANALYSIS, OBSERVATION PLANNING, MISSION SCHEDULING, SATELLITE OPERATIONS, SCIENCE DATA PROCESSING SUPPORT, SPACECRAFT HEALTH/SAFETY/PERFORMANCE ANALYSIS, INSTRUMENT PERFORMANCE SUPPORT ANALYSIS, FLIGHT/GROUND SYSTEM&SOFTWARE, AND ANOMALY RESOLUTION&ANALYSIS.
openMar 1, 2027Up to $131,260,000
OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE R
openMar 31, 2027Up to $132,450,000
THE PURPOSE OF CHARLES IS TO PROVIDE SUPPORT FOR AIRCRAFT AT JSC, BASED AT ELLINGTON FIELD IN HOUSTON, AND AT EL PASO, TEXAS
openSep 30, 2026Up to $143,190,000
PROVIDE THREE LANDIS FLIGHT INSTRUMENT UNITS AND RELATED SERVICES, INCLUDING THE DESIGN, ENGINEERING ANALYSES, DEVELOPMENT, FABRICATION, INTEGRATION, ALGORITHM DEVELOPMENT, TEST, EVALUATION, DELIVERY, AND SUPPORT FOR THE LANDIS
openMar 10, 2031Up to $138,000,000
GEOXO SOUNDER INSTRUMENT
openOct 31, 2050Up to $133,620,000
TAS::80 0122::TAS SPACE ENVIRONMENT IN-SITU (SEISS) INSTRUMENTS FOR WEATHER SATELLITES
openJun 25, 2039Up to $133,050,000
NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUC
openMay 31, 2028Up to $139,390,000
THE PURPOSE OF THIS CONTRACT IS TO ACQUIRE REPAIRS, OPERATIONS & MAINTENANCE, AND ENGINEERING (ROME) AND RELATED SERVICES FOR THE GODDARD SPACE FLIGHT CENTER (GREENBELT AND WALLOPS FLIGHT FACILITY).
openSep 14, 2028Up to $147,080,000
JUNO PHASE E 44-16499
openSep 24, 2028Up to $147,890,000
DSN OPERATION AND MAINTENANCE CDSCC
openSep 30, 2028Up to $147,920,000
PROGRAM SUPPORT SERVICES (CPSS) PROGRAMMATIC SUBJECT MATTER EXPERT (SME) IDIQ TASK ORDER FOR MARSHALL SPACE FLIGHT CENTER (MSFC).
openAug 31, 2026Up to $149,000,000
NSROC IV CONTRACTOR SHALL DESIGN, FABRICATE, INTEGRATE, & PERFORM FLIGHT QUALIFICATION TESTING OF SUB-ORBITAL PAYLOADS, PROVIDE LAUNCH VEHICLES & ASSOCIATED HARDWARE, & PROVIDE VARIOUS ACTIVITIES ASSOCIATED WITH SUBSEQUENT MISSION LAUNCH OPERATIONS
openSep 30, 2028Up to $147,260,000
EXOPLANET EXPLORATION ION PROGRAM (EXEP) SCIENCE&RESEARCH TECHNOLOGY (ST&T) THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGR
openSep 30, 2028Up to $153,280,000
INCUS (INVESTIGATION OF CONVECTIVE UPDRAFTS) (89-111155)
openSep 30, 2028Up to $155,470,000
OPERATIONS AND MANAGEMENT OF THE NASA BALLOON FACILITY
openSep 30, 2027Up to $163,490,000
SURFACE BIOLOGY & GEOLOGY (SBG): PRE-PHASE A AND PHASE A PLAN
openSep 28, 2026Up to $164,270,000
NASA-WIDE SPECIALIZED ENGINEERING, EVALUATION AND TEST SERVICES (NSEETS) TO PROVIDE ON/OFF-SITE PROJECT INDEPENDENT MULTIDISCIPLINARY ENGINEERING SERVICES, TESTING, CONSULTING, CONTRACTOR-ON-SITE MONITORING, AND EVALUATION OF PROJECT AND/OR PROGRAMS.
openSep 30, 2028Up to $166,340,000
NEW HORIZON -- PLUTO MISSION PHASE B
openSep 30, 2029Up to $166,880,000
IGF::CT::IGF THIS "TASK ORDER" HAS BEEN CREATED IN THE CONTRACT MANAGEMENT MODULE (CMM) SYSTEM FOR FUNDING PURPOSES ONLY AND IS NOT AN ACTUAL TASK ORDER WITH A STATEMENT OF WORK AND OTHER TASK ORDER REQUIREMENTS. THIS "TASK ORDER" HAS BEEN CREATED FOR FUNDING OBLIGATIONS ONLY AND TO ACCOUNT FOR CMM AND SAP FINANCIAL SYSTEM FUNCTIONALITY. THIS "TASK ORDER" IS TO FUND NNL13AA14C CLIN 402 (FFP IDIQ). CENTER MAINTENANCE, OPERATIONS, AND ENGINEERING (CMOE) CONTRACT. REQUIREMENT FOR THE MAINTENANCE, OPERATIONS, AND ENGINEERING OF LARC'S INSTITUTIONAL FACILITIES AND HIGHLY TECHNICAL RESEARCH FACILITIES FOR MISSION SUCCESS. THE CMOE CONTRACT WILL PROVIDE CORE SUPPORT SERVICES TO LARC IN THE AREAS OF INSTITUTIONAL AND RESEARCH OPERATIONS, MAINTENANCE, AND ENGINEERING (OME). THESE TECHNICAL SERVICES INCLUDE: RESEARCH FACILITIES OPERATIONS (E.G., HIGHLY SPECIALIZED WIND TUNNELS, LABORATORIES, TEST STANDS, INSTRUMENTATION CALIBRATION/REPAIR); CENTRAL UTILITIES OPERATIONS (E.G., STEAM, COMPRESSED A
openJul 31, 2026Up to $178,860,000
INTERFACE REGION IMAGING SPECTROGRAPH (IRIS). THE CONTRACTOR SHALL REFINE AND EVOLVE THE CONTRACTOR'S COST ESTIMATE FOR PHASES B-F FOR THE INTERFACE REGION IMAGING SPECTROGRAPH (IRIS) MISSION SUBMITTED IN RESPONSE TO NASA ANNOUNCEMENT OF OPPORTUNITY #NNH07ZDA003O FOR THE EXPLORERS PROJECTS DIVISION. THE PRIMARY TASKS IN PHASE B WILL INCLUDE THE GENERATION AND PRESENTATION OF THE SYSTEMS REQUIREMENTS REVIEW (SRR) AND THE PRELIMINARY DESIGN REVIEW (PDR). IN ORDER TO SUPPORT THESE REVIEWS, THE CONCEPT DEFINITION EFFORTS SHALL ENCOMPASS THE WORK REQUIRED TO UPDATE AND REFINE THE PROPOSAL'S SCIENCE INVESTIGATION OBJECTIVES AND PLANS (IF NECESSARY), INSTRUMENT AND SPACECRAFT CONCEPTS AND PERFORMANCE CHARACTERISTICS, AND SCIENCE OPERATIONS AND FLIGHT OPERATIONS PLANS AND CONCEPTS. THESE EFFORTS SHALL IDENTIFY THE CONDITIONS AND CONSTRAINTS NECESSARY FOR THE DEVELOPMENT OF AN INTEGRATED IRIS MISSION APPROACH. THE CONTRACTOR'S MISSION INTEGRATION EFFORTS SHALL INCLUDE CONSIDERATIONS FOR THE ACC
openSep 30, 2027Up to $191,040,000
MARS PROGRAM MANAGEMENT AND FUTURE PLANNING 60-8583
openSep 30, 2028Up to $190,700,000
ENERGIA WILL PROVIDE HARDWARE AND SERVICES THAT SUPPORT INTERNATIONAL SPACE STATION
openDec 31, 2028Up to $192,510,000
NASA CONSOLIDATED APPLICATION AND PLATFORM SERVICES (NCAPS)
openJun 30, 2026Up to $190,900,000
THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS) IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS
openApr 30, 2026Up to $181,430,000
IGF::OT::IGF LAUNCH VEHICLE/STAGES ADAPTER
openSep 30, 2027Up to $205,530,000
MARS RECONNAISSANCE ORBITER: PHASE E 62-10131
openSep 30, 2028Up to $205,870,000
TIME HISTORY OF EVENTS&MACROSCALE INTERACTIONS DURING SUBSTORMS (THEMIS) MISSION PHASE A EFFORT THE CONTRACTOR SHALL PROVIDE A CONCEPT STUDY FOR THE THEMIS MISSION IN ORDER TO PROVIDE NASA WITH MORE DEFINITIVE INFORMATION REGARDING THE COST, RISK, AND FEASIBILITY OF THE INVESTIGATION. THE CONTRACTOR SHALL PREPARE AND DELIVER A CONCEPT STUDY REPORT DETAILING THE RESULTS OF THE STUDY IN ACCORDANCE WITH ATTACHMENT B OF THE CONTRACT ENTITLED "MEDIUM-CLASS EXPLORER PROGRAM GUIDELINES AND CRITERIA FOR THE PHASE A CONCEPT STUDY". THE CONTRACTOR SHALL ALSO SUPPORT A NASA SITE VISIT AT ITS FACILITY TO DISCUSS THE CONCEPT STUDY REPORT AND ATTEND A PHASE A CONCEPT STUDY REVIEW MEETING, BRIDGE PHASE OPTION: THE CONTRACTOR SHALL COMMENCE INITIAL DEFINITION PHASE ACTIVITIES, INCLUDING LONG LEAD PARTS PROCUREMENTS. AND THE FOLLOWING ACTIVITIES: - PROVIDE PROGRAM MANAGEMENT FOR THEMIS; - BEGIN SCIENTIFIC STUDIES AND SIMULATIONS TO PROVIDE SCIENTIFIC INPUT FOR INSTRUMENT AND ORBIT DESIGN ENSURING THEY
openSep 30, 2028Up to $199,540,000
FLIGHT DYNAMICS SUPPORT SERVICES III (FDSS). THIS CONTRACT IS FOR, BUT NOT LIMITED TO SOFTWARE ENGINEERING SUPPORT, FLIGHT DYNAMICS FACILITY OPERATIONS SUPPORT, FLIGHT DYNAMICS SYSTEMS ENGINEERING SUPPORT&CONJUNCTION ASSESSMENTS.
openApr 30, 2027Up to $199,410,000
THE REQUIREMENT IS TO ASSIST NASA IN ACCELERATING THE INTRODUCTION OF MEGAWATT CLASS EAP SYSTEMS INTO FUTURE AIRCRAFT PRODUCTS BY U.S. INDUSTRY. THIS EFFORT HELPS TO IDENTIFY CERTIFICATION GAPS, AND ADDRESS GAPS THROUGH GROUND TEST AND FLIGHT TESTS.
openSep 29, 2026Up to $211,060,000
MARSHALL ENGINEERING TECHNICIANS AND TRADES SUPPORT (METTS III) COVERS A WIDE RANGE OF ENGINEERING TECHNICIANS AND TRADE SKILLS TO PERFORM TESTING GROUND AND SPACE BASED RESEARCH TEST OPERATIONS DATA ANALYSIS INSTRUMENTATION CALIBRATION
openDec 31, 2026Up to $214,590,000
SPACE AND EARTH SCIENCES DATA ANALYSIS (SESDA V)
openMar 31, 2028Up to $227,460,000
MULTI-SLIT SOLAR EXPLORER (MUSE) MISSION PHASE A
openJul 1, 2027Up to $214,760,000
IGF::OT::IGF NASA, THROUGH THE SPACE TECHNOLOGY MISSION DIRECTORATE (STMD,) SEEKS TO DEMONSTRATE AN ADVANCED SOLAR ELECTRIC PROPULSION (EP) SYSTEM THAT WILL ENABLE FUTURE DEEP SPACE HUMAN AND ROBOTIC EXPLORATION APPLICABLE TO THE UNITED STATES PRIVATE AND PUBLIC SECTOR SPACE NEEDS. THE PURPOSE OF THE ADVANCED ELECTRIC PROPULSION (EP) SYSTEM (AEPS) CONTRACT IS THE DEVELOPMENT AND DELIVERY OF EP STRING SETS TO SUPPORT AN ADVANCED SEP DEMONSTRATION MISSION. DURING THE CONTRACT BASE PERIOD OF PERFORMANCE, THE CONTRACTOR WILL DEVELOP, TEST, AND DELIVER ENGINEERING DEVELOPMENT END ITEMS THAT WILL REDUCE THE RISK OF DEVELOPING THE FLIGHT END ITEMS. DURING THE OPTION PERIOD OF PERFORMANCE, IF EXERCISED, THE CONTRACTOR WILL DEVELOP, VERIFY, AND DELIVER THE FLIGHT END ITEMS.
openAug 4, 2027Up to $230,230,000
ADVANCED MULTI-MISSION OPERATING SYSTEM (AMMOS) (93-107877)
openSep 27, 2026Up to $223,190,000
THE OVERALL SCOPE OF THIS CONTRACT IS TO PROVIDE WALLOPS RANGE OPERATIONS AND MAINTENANCE SUPPORT SERVICES TRAINING COMMAND, CONTROL, COMMUNICATIONS, INFORMATION AND COMPUTER SYSTEMS SERVICES TESTING, MODIFYING AND INSTALLING COMMUNICATIONS AND ELECTRONIC SYSTEMS AT LAUNCH FACILITIES, LAUNCH CONTROL CENTERS AND TEST FACILITIES RANGE SUSTAINING ENGINEERING SERVICES, AND GROUND OPERATIONS SUPPORT. THIS EFFORT PROVIDES DIRECT CUSTOMER SUPPORT TO NASA WFF'S RANGE BY PROVIDING QUALIFIED PERSONNEL, EQUIPMENT, TOOLS, MATERIALS, VEHICLES, SPECIALIZED TEST EQUIPMENT, SUPERVISION, AND OTHER SERVICES. NASA'S WFF REQUIRES AN INNOVATIVE, INTEGRATED, FLEXIBLE AND EFFECTIVE MANAGEMENT APPROACH AND THE CONTRACTOR MUST PROVIDE TECHNICAL SUPPORT IN A PLANNED AND COORDINATED MANNER WHICH WILL ENSURE ESSENTIAL WALLOPS RANGE SUPPORT SYSTEMS ARE READY TO SUPPORT USER REQUIREMENTS, AND CAUSE NO IMPACT TO WALLOPS RANGE PROGRAM SCHEDULES DUE TO EQUIPMENT DEGRADATION, FAILURES, SYSTEM PROBLEMS OR REPRIORITIZATI
openJun 30, 2026Up to $232,850,000
IGF::CT::IGF THIS "TASK ORDER" HAS BEEN CREATED IN THE CONTRACT MANAGEMENT MODULE (CMM) SYSTEM FOR FUNDING PURPOSES ONLY AND IS NOT AN ACTUAL TASK ORDER WITH A STATEMENT OF WORK AND OTHER TASK ORDER REQUIREMENTS. THIS "TASK ORDER" HAS BEEN CREATED FOR FUNDING OBLIGATIONS ONLY AND TO ACCOUNT FOR CMM AND SAP FINANCIAL SYSTEM FUNCTIONALITY. THIS "TASK ORDER" IS TO FUND NNL13AA14C CLIN 2 (OPERATIONS). CENTER MAINTENANCE, OPERATIONS, AND ENGINEERING (CMOE) CONTRACT. REQUIREMENT FOR THE MAINTENANCE, OPERATIONS, AND ENGINEERING OF LARC'S INSTITUTIONAL FACILITIES AND HIGHLY TECHNICAL RESEARCH FACILITIES FOR MISSION SUCCESS. THE CMOE CONTRACT WILL PROVIDE CORE SUPPORT SERVICES TO LARC IN THE AREAS OF INSTITUTIONAL AND RESEARCH OPERATIONS, MAINTENANCE, AND ENGINEERING (OME). THESE TECHNICAL SERVICES INCLUDE: RESEARCH FACILITIES OPERATIONS (E.G., HIGHLY SPECIALIZED WIND TUNNELS, LABORATORIES, TEST STANDS, INSTRUMENTATION CALIBRATION/REPAIR); CENTRAL UTILITIES OPERATIONS (E.G., STEAM, COMPRESSED A
openJul 31, 2026Up to $251,980,000
THE PRINCIPAL PURPOSE OF THIS FOLLOW-ON CONTRACT IS TO PROVIDE MULTIDISCIPLINE ENGINEERING SUPPORT SERVICES.
openNov 30, 2028Up to $254,750,000
EARTH OBSERVING SYSTEM DATA AND INFORMATION SYSTEM (EOSDIS) EVOLUTION AND DEVELOPMENT (EED)-3 EOSDIS EED-3 SERVICES
openJul 31, 2026Up to $252,770,000
MARSHALL OPERATIONS SYSTEMS, SERVICES, AND INTEGRATION II (MOSSI II)
openDec 31, 2026Up to $243,130,000
UNDER THIS SES III CONTRACT, THE SOFTWARE ENGINEERING DIVISION (SED) OF THE ENGINEERING AND TECHNOLOGY DIRECTORATE (ETD) PROVIDES QUALITY SOFTWARE PRODUCTS, SERVICES AND EXPERTISE TO ENSURE THE SUCCESS OF NASA MISSIONS AND STAKEHOLDERS.
openAug 31, 2027Up to $244,700,000
EXPLORATION UPPER STAGE ENGINES MSFC WILL PROCURE TEN (10) RL10 FLIGHT ENGINES FROM AEROJET ROCKETDYNE, INC. TO SUPPORT THE SPACE LAUNCH SYSTEM (SLS) EXPLORATION MISSIONS 2 AND 3 (EM-2 AND EM-3). EACH FLIGHT WILL REQUIRE A FOUR (4) ENGINE CLUSTER. ADDITIONALLY, TWO (2) SPARE ENGINES WILL BE PROCURED. CORRESPONDING TO THESE SPECIFIC RL10 ENGINES, NASA MSFC WILL PROCURE VEHICLE AND PROGRAM INTEGRATION SUPPORT, FLIGHT SUPPORT, AND HUMAN RATING COMPLIANCE REVIEW SUPPORT.
openDec 31, 2028Up to $285,090,000
MARS SCIENCE LABORATORY 67-8636
openSep 30, 2028Up to $306,770,000
EXPLORATION EXTRAVEHICULAR ACTIVITY SERVICE (XEVAS) ARTEMIS PROGRAM
openJun 2, 2028Up to $312,940,000
IGF::CT::IGF THIS "TASK ORDER" HAS BEEN CREATED IN THE CONTRACT MANAGEMENT MODULE (CMM) SYSTEM FOR FUNDING PURPOSES ONLY AND IS NOT AN ACTUAL TASK ORDER WITH A STATEMENT OF WORK AND OTHER TASK ORDER REQUIREMENTS. THIS "TASK ORDER" HAS BEEN CREATED FOR FUNDING OBLIGATIONS ONLY AND TO ACCOUNT FOR CMM AND SAP FINANCIAL SYSTEM FUNCTIONALITY. THIS "TASK ORDER" IS TO FUND NNL13AA14C CLIN 1 (MAINTENANCE). CENTER MAINTENANCE, OPERATIONS, AND ENGINEERING (CMOE) CONTRACT. REQUIREMENT FOR THE MAINTENANCE, OPERATIONS, AND ENGINEERING OF LARC'S INSTITUTIONAL FACILITIES AND HIGHLY TECHNICAL RESEARCH FACILITIES FOR MISSION SUCCESS. THE CMOE CONTRACT WILL PROVIDE CORE SUPPORT SERVICES TO LARC IN THE AREAS OF INSTITUTIONAL AND RESEARCH OPERATIONS, MAINTENANCE, AND ENGINEERING (OME). THESE TECHNICAL SERVICES INCLUDE: RESEARCH FACILITIES OPERATIONS (E.G., HIGHLY SPECIALIZED WIND TUNNELS, LABORATORIES, TEST STANDS, INSTRUMENTATION CALIBRATION/REPAIR) CENTRAL UTILITIES OPERATIONS (E.G., STEAM, COMPRESSED A
openJul 31, 2026Up to $263,060,000
SURFACE WATER AND OCEAN TOPOGRAPHY (SWOT) 83-16443
openSep 30, 2026Up to $295,610,000
SPHEREX:AN ALL-SKY SPECTRAL SURVEY 71-700089
openApr 30, 2028Up to $267,710,000
TAS::80 0114::TAS SOLAR ULTRAVIOLET IMAGER (SUVI) INSTRUMENT. THIS CONTRACT IS FOR THE DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, EVALUATE AND SUPPORT LAUNCH OF THE SOLAR ULTRAVIOLET IMAGER (SUVI) INSTRUMENT, SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT THE SATELLITE OPERATIONS CONTROL CENTER (SOCC). THE SUVI IS CLASSIFIED AS A NON-PRIMARY INSTRUMENT ON THE GOES-R SATELLITE AND HAS A RISK CLASSIFICATION OF B. THE SUVI INSTRUMENT PROVIDES A BROADBAND IMAGING IN THE EXTREME ULTRAVIOLET WAVELENGTH RANGE TO MONITOR THE ENTIRE DYNAMIC RANGE OF SOLAR FEATURES, FROM CORONAL HOLES TO FLARES, AS WELL AS THE ESTIMATE OF TEMPERATURE AND EMISSION MEASURE. THESE DATA ARE USED FOR GEOMAGNETIC STORM FORECASTS AND FORECASTS OF SOLAR ENERGETIC PARTICLE EVENTS RELATED TO FLARES. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR 4 FL
openApr 30, 2039Up to $325,880,000
GEOXO IMAGER (GXI) INSTRUMENT IMPLEMENTATION
openJun 30, 2050Up to $340,960,000
THIS DELIVERY ORDER IS ISSUED PURSUANT TO THE SCHEDULE OF SUPPLIES, CONTRACT PERIOD PRICING, OTHER PRICING OPTIONS, AND TERMS AND CONDITIONS OF CONTRACT 80KSC023DA010 FOR HELIUM AT KENNEDY SPACE CENTER.
openOct 31, 2026Up to $346,980,000
DESIGN BUILD AND DELIVER 3 GEOXO SPACECRAFT
openJun 30, 2048Up to $363,370,000
THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.
openApr 16, 2033Up to $347,820,000
THE ETIS III CONTRACT WILL PROVIDE ENVIRONMENTAL TEST AND INTEGRATION RELATED SERVICES FOR NASA GSFC ENGINEERING AND TECHNOLOGY DIRECTORATE (ETD) MECHANICAL SYSTEMS DIVISION AND RELATED ORGANIZATIONS FOR THE FORMULATION, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACEFLIGHT AND GROUND SYSTEM HARDWARE AND SOFTWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.
openApr 30, 2026Up to $337,190,000
THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCE
openJun 30, 2026Up to $360,200,000
VOLATILES INVESTIGATING POLAR EXPLORATION ROVER (VIPER) DELIVERY
openOct 31, 2026Up to $314,010,000
TAS::80 0120::TAS AS THE PRINCIPAL INVESTIGATOR (PI) INSTITUTION FOR THE MAGNETOSPHERIC MULTISCALE (MMS) INSTRUMENT SUITE SCIENCE TEAM (ISST), THE CONTRACTOR IS RESPONSIBLE FOR LEADING THE SOLVING MAGNETOSPHERIC ACCELERATION RECONNECTION AND TURBULENCE (SMART) TEAM THROUGH ALL MISSION PHASES. THE SCOPE OF WORK SHALL INCLUDE, BUT NOT BE LIMITED, TO THE FOLLOWING: - MANAGE THE SMART TEAM THROUGH PHASES B THROUGH E OF THE MMS MISSION, - DEFINING SCIENCE GOALS AND OBJECTIVES - ASSIST THE MMS PROJECT AND HQ SCIENCE MISSION DIRECTORATE HELIOPHYSICS DIVISION IN THE PREPARATION OF LEVEL 1 REQUIREMENTS FOR THE MMS MISSION - FLOW-DOWN OF TOP-LEVEL MISSION REQUIREMENTS TO THE APPROPRIATE ELEMENTS OF THE INSTRUMENT SUITE - DESIGN, FABRICATION, INTEGRATION, CALIBRATION, TESTING AND DELIVERY OF FOUR FULLY QUALIFIED, FLIGHT INSTRUMENT SUITES TO OBSERVATORY INTEGRATION AND TEST (I&T) PLUS SPARES - DESIGN, DEVELOPMENT, INTEGRATION AND TESTING OF THE SOC - SUPPORT OBSERVATORY-LEVEL I&T ACTIVITIES - PROV
openSep 30, 2026Up to $383,430,000
INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) PHASE CD
openJan 31, 2028Up to $400,020,000
WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) CORONAGRAPH THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RES
openJan 31, 2027Up to $391,510,000
OPERATION AND MAINTENANCE OF THE MADRID DEEP SPACE COMMUNICATIONS COMPLEX.
openMay 16, 2026Up to $412,390,000
ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES CULMINATING IN AN OSIRIS-REX PROJECT MISSION DESIGN REVIEW (MDR). THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE OSIRIS-REX PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM.
openMar 31, 2027Up to $437,350,000
OPTICAL TELESCOPE ASSEMBLY (OTA) THIS CONTRACT PROVIDES FOR ALL EFFORTS AND RESPONSIBILITIES FOR THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO BUILD, REFURBISH, OR MODIFY THE OTA AS REQUIRED TO MEET THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) PERFORMANCE REQUIREMENTS.
openJan 31, 2027Up to $372,590,000
DESIGN, DEVELOP, MANUFACTURE, TEST, INTEGRATE, ACHIEVE NASA ACCEPTANCE, DELIVER, AND SUSTAIN ITS UNITED STATES DEORBIT VEHICLE (USDV) SUCH THAT THE USDV CAN PERFORM THE FINAL DEORBIT OF THE INTERNATIONAL SPACE STATION (ISS)
openMar 31, 2031Up to $425,570,000
THE MIST II CONTRACT WILL PROVIDE MULTIDISCIPLINARY ENGINEERING TASK ORDERS FOR THE FORMULATION, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT AND GROUND SYSTEM HARDWARE AND SOFTWARE.
openSep 13, 2027Up to $393,480,000
THE PURPOSE OF THIS CONTRACT IS TO ACQUIRE SCIENTIFIC RESEARCH SERVICES THAT CONCEIVES, DEVELOPS AND APPLIES SPACE, FIELD-DEPLOYED (I.E. AIRBORNE AND IN SITU) AND LABORATORY BASED TECHNOLOGIES AND OBSERVATIONS OF THE EARTH SYSTEMS.
openSep 30, 2026Up to $436,270,000
GROUND SYSTEMS AND MISSION OPERATIONS (GSMO-3)
openMay 31, 2027Up to $573,500,000
TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS
openJun 25, 2039Up to $486,220,000
ENGINEERING SERVICES AND DEVELOPMENT LEADING TO THE DELIVERY OF THE OMPS PROTOFLIGHT MODEL AND SUPPORT.
openNov 10, 2029Up to $478,990,000
NASA ISRO SYNTHETIC APERTURE RADAR (NISAR) MISSION 89-17620
openSep 30, 2028Up to $756,780,000
THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, FACILITIES, EQUIPMENT, MATERIAL, AND SERVICES NECESSARY TO DESIGN, DEVELOP, MANUFACTURE, INTEGRATE, TEST, AND DELIVER THE HARDWARE, DOCUMENTATION, AND SERVICES SPECIFIED HEREIN. THE CONTRACTOR SHALL ALSO PROVIDE SUPPORT, AS REQUIRED, FOR PRE-DELIVERY MISSION INTEGRATION ACTIVITIES, SUCH AS NPP MISSION OPERATIONS REVIEW AND JPSS DELTA-PDR. DOCUMENTATION AND OTHER TASKS SHOULD BE IN ACCORDANCE WITH THE REQUIREMENTS OF THIS SOW AND THE APPLICABLE DOCUMENTATION REFERENCED IN SECTION 2.3 HEREIN. COMPLIANCE WITH THE REQUIREMENTS STATED HEREIN, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
openMar 1, 2029Up to $584,350,000
NEAR EARTH OBJECT SURVEYOR (NEO SURVEYOR) PROJECT (71-107722)
openOct 31, 2027Up to $855,850,000
ENGINEERING SERVICES AND DEVELOPMENT LEADING TO THE DELIVERY OF THE VISIBLE INFRARED IMAGER RADIOMETER (VIRS) INSTRUMENT AND SUPPORT.
openMar 1, 2029Up to $1,220,000,000
ENGINEERING SERVICES AND DEVELOPMENT LEADING TO THE DELIVERY OF THE CROSS TRACK INFRARED SOUNDER (CRIS) INSTRUMENT AND SUPPORT.
openNov 10, 2029Up to $814,440,000
TAS::80 0122::TAS DEVELOPMENT, MANUFACTURING AND SUPPORT TO WEATHER OBSERVING INSTRUMENT
openJun 25, 2039Up to $1,040,000,000
PSYCHE: JOURNEY TO A METAL WORLD THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNM
openSep 30, 2028Up to $807,810,000
DRAGONFLY EXTENDED PHASE B MISSION UNDER 80MSFC20D0004 AEROSPACE RESEARCH, DEVELOPMENT AND ENGINEERING SUPPORT (ARDES) II.
openAug 31, 2028Up to $1,270,000,000
DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
openJun 5, 2026Up to $1,550,000,000
M2020 MARS SCIENCE ROVER PROJECT-PHASE A-D 60-19107 THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND A
openSep 24, 2028Up to $1,280,000,000
THE EXPLORATION AND SPACE COMMUNICATIONS PROJECTS DIVISION (ESC) IS A NATIONAL RESOURCE LOCATED AT GODDARD SPACE FLIGHT CENTER (GSFC) WHICH ENABLES SCIENTIFIC DISCOVERY AND SPACE EXPLORATION BY PROVIDING INNOVATIVE AND MISSION-EFFECTIVE SPACE COMMUNICATIONS AND NAVIGATION SOLUTIONS TO A LARGE COMMUNITY OF DIVERSE CUSTOMERS. ESC MANAGES OPERATIONAL GEOSTATIONARY COMMUNICATIONS RELAY SATELLITES AND GROUND SYSTEMS FOR THE SPACE COMMUNICATIONS AND NAVIGATION (SCAN) PROGRAM AT NASA HEADQUARTERS. TODAY, SCAN NETWORK SYSTEMS CONSIST OF THE SPACE NETWORK (SN), THE NEAR EARTH NETWORK (NEN), AND THE DEEP SPACE NETWORK (DSN). THE DAY-TO-DAY MANAGEMENT OF THESE THREE NETWORKS IS CURRENTLY NOT FULLY CONSISTENT. IT IS THE INTENTION OF THE GOVERNMENT TO UNIFY THE SN AND NEN WHERE PRACTICABLE UNDER THIS CONTRACT USING INTEGRATED, COMMON MANAGEMENT PRACTICES AND NETWORK SOLUTIONS.
openSep 30, 2027Up to $1,510,000,000
FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
openJun 30, 2026Up to $4,420,000,000
IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.
openSep 30, 2029Up to $3,180,000,000
IGF::OT::IGF THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. NASA CERTIFICATION UNDER CLIN 001 IS COMPLETE WHEN THE CONTRACTOR'S CREW TRANSPORTATION SYSTEM (CTS) HAS MET NASA'S R
openDec 31, 2030Up to $3,030,000,000
SPACE LAUNCH SYSTEM (SLS) STAGES PRODUCTION AND EVOLUTION CONTRACT (SPEC)
openJul 1, 2028Up to $2,380,000,000
MARS SAMPLE RETURN (MSR) PROGRAM - PHASE A 40-108270
openSep 24, 2028Up to $1,590,000,000
WORK REQUIRED FOR THE DESIGN, DEVELOPMENT, MANUFACTURE, TEST, LAUNCH, DEMONSTRATION, AND ENGINEERING SUPPORT OF THE HUMAN LANDING SYSTEM (HLS) INTEGRATED LANDER.
openDec 6, 2027Up to $3,020,000,000
FOLLOW ON CONTRACT TO PROVIDE OPERATIONS AND SCIENCE SUPPORT TO THE CXO
openSep 30, 2027Up to $1,350,000,000
DEEP SPACE NETWORK (DSN) THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2)
openSep 30, 2028Up to $1,440,000,000
THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT SPAN THE MAJOR PHASES OF THE MISSION BEGINNING WITH FORMULATION THROUGH DEVELOPMENT AND TESTING, AND ENDING ONE YEAR AFTER LAUNCH WITH THE INITIATION OF THE JAMES WEBB SPACE TELESCOPE (JWST) SCIENCE PROGRAM. THESE MAJOR ACTIVITIES ARE SEPARATED INTO THE BASELINE PROGRAM AND SPECIAL STUDIES. THE BASELINE PROGRAM INCLUDES: A. MISSION REQUIREMENTS ANALYSIS AND OBSERVATORY/MISSION DESIGN SUPPORT INCLUDING: TRADESTUDY GENERATION, SCIENCE AND OPERATIONS IMPACT ANALYSIS, SCIENCE SYSTEMS ENGINEERING SUPPORT, AND DESIGN REFERENCE MISSION ANALYSIS. B. GROUND SEGMENT DEVELOPMENT, TESTING, MAINTENANCE AND OPERATIONS INCLUDING: OPERATIONS SUPPORT OF SI, FGS, ISIM, AND OBSERVATORY INTEGRATION AND TEST (I&T), MISSION SIMULATIONS, AND DOCUMENTATION MAINTENANCE, AS WELL AS LOW COST OPERATIONS CONCEPTS. C. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, PROPOSAL MANAGEMENT AND USER GRANT ADMINISTRATION,
openJun 25, 2027Up to $1,500,000,000
IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE
openMay 31, 2029Up to $1,550,000,000
RAPID DDT&E AND DEMONSTRATION OF S SUSTAINABLE HUMAN LANDING SYSTEM INTEGRATED LANDER.
openJan 29, 2029Up to $1,710,000,000
THE GOVERNMENT IS PROCURING THE NEXT-GENERATION GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) SERIES TO CONTINUE ITS MISSION THROUGH NEW REQUIREMENTS SPECIFIED IN THE GOES-R LEVEL I REQUIREMENTS DOCUMENT AND MISSION REQUIREMENTS DOCUMENT (MRD). THE FIRST SATELLITE OF THIS NEW SERIES, DESIGNATED AS GOES-R, WILL PROVIDE THE FIRST MAJOR IMPROVEMENT IN INSTRUMENT TECHNOLOGY SINCE GOES-I LAUNCHED IN 1994. THE GOES-R SERIES WILL INTRODUCE OTHER NEW TECHNOLOGIES IN BOTH THE SPACE AND GROUND SEGMENTS. THESE ADVANCES WILL IMPROVE THE NATION'S ABILITY TO MONITOR AND FORECAST WEATHER AND ENVIRONMENTAL PHENOMENA WITH A SIGNIFICANT INCREASE IN THE NUMBER OF PRODUCTS. ONE OF NOAA'S PRINCIPAL MISSIONS IS TO PROVIDE FORECASTS AND WARNINGS FOR THE UNITED STATES, ITS TERRITORIES, ADJACENT WATERS AND OCEAN AREA FOR THE PROTECTION OF LIFE AND PROPERTY AND ENHANCEMENT OF THE NATIONAL ECONOMY. THIS MISSION REQUIRES THE CAPABILITY TO ACQUIRE, PROCESS, AND DISSEMINATE ENVIRONMENTAL DATA ON AN EXTE
openApr 30, 2039Up to $2,030,000,000
EXTRAVEHICULAR SPACE OPERATIONS CONTRACT (ESOC)
openSep 30, 2027Up to $1,410,000,000
THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT INCLUDE THE FINAL SERVICING MISSION AND SUBSEQUENT OPERATIONS THROUGH END-OF-MISSION. THESE ACTIVITIES INCLUDE: A. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, MANAGEMENT OF THE PROPOSAL SELECTION, TIME ALLOCATION, AND GRANT AWARD COMMITTEE PROCESSES, AND SCIENCE COMMUNITY OUTREACH. B. ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION AND RECEIPT, OBSERVATION PLANNING AND SCHEDULING, UPDATING INSTRUMENT HANDBOOKS, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, ANOMALY INVESTIGATION SUPPORT, USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE AND ENGINEERING OPERATIONS SUPPORT. C. GROUND SYSTEM SUSTAINING ENGINEERING INCLUDING: SCIENCE OPERATION SYSTEM MAINTENANCE, INFRASTRUCTURE ADMINISTRATION AND SUPPORT, AND DOCUMENTATION MAINTENANCE D. SERVICING MISSION SUPPORT INCLUDING: PR
openJun 30, 2026Up to $2,510,000,000
ENGINEERING SERVICES AND SCIENCE CAPABILITY AUGMENTATION (ESSCA)
openNov 30, 2026Up to $1,890,000,000
INTERIM CRYOGENIC PROPULSION STAGE FOR SLS
openDec 31, 2027Up to $1,260,000,000
ELECTRICITY SERVICES
openAug 21, 2028Up to $75,240,000
SMAP (SOIL MOISTURE ACTIVE/PASSIVE) MISSION 88-12659
openSep 27, 2026Up to $77,110,000
GLOBAL LYMAN-ALPHA IMAGERS OF THE DYNAMIC EXOSPHERE (GLIDE) INSTRUMENT PROGRAM DEVELOPMENT (PHASE B) SUPPORT.
openMay 5, 2026Up to $77,490,000
SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
openAug 31, 2027Up to $81,170,000
DSN APERTURE ENHANCEMENT PROJECT (DAEP) THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND
openJun 30, 2027Up to $80,100,000
SCIENCE MISSION DIRECTORATE, RESEARCH AND ANALYSIS FOR SPACE SCIENCE, OUTER SOLAR SYSTEM AND ASTEROID SCIENCE
openSep 30, 2027Up to $82,090,000
GRAVITY RECOVERY AND CLIMATE EXPERIMENT-FOLLOW ON (GRACE-FO) MISSION: PHASE A 83-17494
openSep 30, 2028Up to $81,140,000
CARGO MISSION CONTRACT 4 (CMC4)
openSep 30, 2026Up to $79,580,000
COOPERATIVE AUTONOMOUS DISTRIBUTED ROBOTIC EXPLORERS TECH DEMONSTRATION (CADRE) 15-107746
openSep 27, 2026Up to $81,830,000
NATIONAL CENTER FOR CRITICAL INFORMATION PROCESSING AND STORAGE (NCCIPS)
openSep 30, 2026Up to $87,570,000
ORBITING CARBON OBSERVATORY-2 (OCO-2) TAILORED FORMULATION 85-15362
openSep 30, 2028Up to $82,400,000
STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.
openApr 8, 2030Up to $82,350,000
PHYSICAL OCEANOGRAPHY DISTRIBUTED ACTIVE ARCHIVE CENTER-2 (PO.DAAC-2) THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND
openSep 30, 2026Up to $85,350,000
MARS ODYSSEY: PHASE E 68-6480
openSep 30, 2028Up to $89,710,000
VERITAS (VENUS EMISSIVITY, RADIO SCIENCE, INSAR, TOPOGRAPHY, AND SPECTROSCOPY) (41-108259)
openSep 27, 2026Up to $88,740,000
THIS DELIVERY ORDER IS FOR PROVIDING AN ENTERPRISE-WIDE SOLUTION FOR CLOUD SERVICES
openJan 31, 2029Up to $92,710,000
LOGISTICS SERVICES
openFeb 28, 2027Up to $90,220,000
SENTINEL-6 MISSION-PHASE C/D THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS
openApr 30, 2026Up to $91,750,000
IGF::CT::IGF THIS "TASK ORDER" HAS BEEN CREATED IN THE CONTRACT MANAGEMENT MODULE (CMM) SYSTEM FOR FUNDING PURPOSES ONLY AND IS NOT AN ACTUAL TASK ORDER WITH A STATEMENT OF WORK AND OTHER TASK ORDER REQUIREMENTS. THIS "TASK ORDER" HAS BEEN CREATED FOR FUNDING OBLIGATIONS ONLY AND TO ACCOUNT FOR CMM AND SAP FINANCIAL SYSTEM FUNCTIONALITY. THIS "TASK ORDER" IS TO FUND NNL13AA14C CLIN 403 (CPFF IDIQ). CENTER MAINTENANCE, OPERATIONS, AND ENGINEERING (CMOE) CONTRACT. REQUIREMENT FOR THE MAINTENANCE, OPERATIONS, AND ENGINEERING OF LARC'S INSTITUTIONAL FACILITIES AND HIGHLY TECHNICAL RESEARCH FACILITIES FOR MISSION SUCCESS. THE CMOE CONTRACT WILL PROVIDE CORE SUPPORT SERVICES TO LARC IN THE AREAS OF INSTITUTIONAL AND RESEARCH OPERATIONS, MAINTENANCE, AND ENGINEERING (OME). THESE TECHNICAL SERVICES INCLUDE: RESEARCH FACILITIES OPERATIONS (E.G., HIGHLY SPECIALIZED WIND TUNNELS, LABORATORIES, TEST STANDS, INSTRUMENTATION CALIBRATION/REPAIR); CENTRAL UTILITIES OPERATIONS (E.G., STEAM, COMPRESSED
openJul 31, 2026Up to $92,650,000
PROVIDE AIRCRAFT AND GROUND CONTROL STATION (GCS) SPARE PARTS AND PROVIDE ENGINEERING, MAINTENANCE TECHNICIAN, LOGISTICS TECHNICIAN AND PILOT SUPPORT.
openOct 29, 2026Up to $93,220,000
PROGRAM MANAGEMENT OF THE NASA POSTDOCTORAL PROGRAM 2
openJan 29, 2027Up to $93,650,000
CRISTAL PROJECT - FORMULATION PHASE A/B (89-210198)
openSep 30, 2028Up to $95,710,000
JPL RADIOISOTOPE NUCLEAR SYSTEMS AND TECHNOLOGY PROGRAM SUPPORT TO NASA RADIOISOTOPE POWER SYSTEMS (RPS) PROGRAM 43-12921
openJul 30, 2028Up to $97,410,000
THIS EFFORT IS FOR WORK PERFORMED DURING PHASE B THROUGH F OF THE TRANSITING EXOPLANET SURVEY SATELLITE (TESS) MISSION. THE SPECIFIC REQUIREMENTS FOR EACH OF THESE PHASES ARE PRESENTED IN INDIVIDUAL SECTIONS BELOW. THE EFFORT ALSO INCLUDES TASKS TO: DESIGN, ANALYZE, VALIDATE, DEVELOP, FABRICATE, ASSEMBLE, INTEGRATE, TEST, AND DELIVER THE TESS SPACECRAFT; INTEGRATE, TEST, AND OPERATE THE TESS OBSERVATORY; AND DEVELOP, TEST, OPERATE, AND SUSTAIN THE ASSOCIATED MISSION OPERATIONS CENTER (MOC). THE CONTRACTOR IS RESPONSIBLE FOR THE DEVELOPMENT OF THE SPACECRAFT AND CAMERA ACCOMMODATION STRUCTURE, INCLUDING THE SUNSHADE. THE TESS INSTRUMENT, CONSISTING OF THE CAMERA STRUCTURE ASSEMBLY, DATA HANDLING UNIT AND HARNESS, WILL BE PROVIDED AS GOVERNMENT FURNISHED EQUIPMENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INTEGRATION ACTIVITIES BETWEEN THE INSTRUMENT AND THE SPACECRAFT WITH INSTRUMENT PERSONNEL SUPPORT. THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, MATERIALS, FACILITIES AND RESOURCES NECESS
openJun 18, 2026Up to $101,980,000
SCIENCE MISSION DIRECTORATE, RESEARCH AND ANALYSIS (R&A), FOR ASTROPHYSICS ROSES AWARDS AND GUEST OBSERVER AWARD SUPPORT
openSep 24, 2028Up to $102,420,000
SCIENCE MISSION DIRECTORATE (SMD) SOLICITATION PEER REVIEW PROGRAM PORTFOLIO SUPPORT
openJul 31, 2026Up to $102,710,000
TAS::80 0120::TAS THIS CONTRACT IS FOR THE TASKS NECESSARY TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, EVALUATE AND SUPPORT LAUNCH OF THE EUVS XRS IRRADIANCE SENSORS (EXIS), SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT THE SATELLITE OPERATIONS CONTROL CENTER (SOCC). THE EXIS IS CLASSIFIED AS A NON-PRIMARY INSTRUMENT SUITE ON THE GOES-R SATELLITE AND HAS A RISK CLASSIFICATION OF B. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR 4 FLIGHT MODELS B) ONE EXIS FLIGHT MODEL (FM) C) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) D) TWO EXIS EMULATORS (EXISES) E) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) F) ONE GROUND PROCESSING DEVELOPMENT SYSTEM (GPDS) G) SPARES FOR THE FOUR FMS H) ALL ADDITIONAL EXIS MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS
openJun 25, 2039Up to $105,230,000
SYSTEMS AND SOFTWARE ASSURANCE SERVICES 2 (SAS2) THE PRINCIPLE PURPOSE OF THIS CONTRACT IS TO ACQUIRE SYSTEMS AND SOFTWARE ASSURANCE SERVICES, INCLUDING IV&V AND SAFETY AND MISSION ASSURANCE ANALYSIS ON SELECTED SYSTEMS AND SOFTWARE BEING DEVELOPED
openSep 30, 2027Up to $106,480,000
TAS::80 0114::TAS THE ATOMOSPHERIC IMAGE ASSEMBLY
openSep 30, 2027Up to $141,100,000
THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).
openJan 31, 2027Up to $307,900,000
SPACE WEATHER NEXT LAGRANGE SERIES SPACECRAFT: SATELLITE BUS, SATELLITE INTEGRATION AND TEST SERVICES, SATELLITE LAUNCH SUPPORT AND COMMISSIONING SERVICES, MISSION OPERATIONS, DATA ACQUISITION, AND ROUTING SERVICES.
openFeb 24, 2035Up to $103,080,000
Johnson Space Center Multiple Award Construction Contract (JMACC)
openApr 6, 2026
COLD ATOM LAB (CAL) 70-18547
openSep 30, 2027Up to $71,710,000
ADVANCED EARTH SCIENCE MISSION CONCEPT STUDIES - SMD 83-11311
openSep 26, 2027Up to $72,290,000
ENVIRONMENTAL MONITORING FOR LONG DURATION EXPLORATION (EMLDE) 47-17229
openSep 30, 2027Up to $71,730,000
FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL
openMay 29, 2026Up to $73,050,000
NASA GSFC GEOSTATIONARY EXTENDED OBSERVATIONS (GEOXO) LIGHTNING MAPPER (LMX) INSTRUMENT IMPLEMENTATION. THE LMX INSTRUMENT IS A SINGLE SPECTRAL CHANNEL INSTRUMENT USED TO MEASURE THE LOCATION AND INTENSITY OF OPTICAL TRANSIENTS PRODUCED BY LIGHTNING.
openOct 9, 2049Up to $74,000,000
JOINT POLAR SATELLITE SYSTEM-2 SPACECRAFT. GD-300HP CORE SPACECRAFT INCLUDING ALL ASSOCIATED HARDWARE, SOFTWARE, SOURCE CODE, MAINTENANCE SYSTEM AND DOCUMENTATION FOR THE JPSS-2 SPACECRAFT MISSION.
openApr 30, 2028Up to $569,520,000
MASS CHANGE (MC) PRE-PHASE A AND PHASE A PLAN (89-109861)
openSep 30, 2028Up to $414,770,000
HIGH PERFORMANCE SPACEFLIGHT COMPUTING (HPSC) PROJECT THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONS
openJun 30, 2026Up to $90,550,000
EUROPA CLIPPER PROJECT THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNI
openSep 30, 2028Up to $2,950,000,000
REPAIR OF THE MECHANICAL SYSTEMS IN BUILDING 7- CREW SYSTEMS LABORATORY
openOct 8, 2026Up to $8,800,000
FLIGHT OPERATIONS AND MAINTENANCE FOR AIRCRAFT SERVICES.
openSep 30, 2026Up to $8,790,000
JPL SUPPORT FOR DRAGONFLY MISSION 42-108051
openAug 31, 2028Up to $8,910,000
REFURBISH POTABLE WATER SYSTEMS AND WATER METERS AT STENNIS SPACE CENTER, MS
openApr 19, 2026Up to $8,890,000
REPLACE AND REPAIR OF SANITARY SEWER SYSTEMS AT NASA LANGLEY RESEARCH CENTER - PHASE 1.
openApr 8, 2027Up to $8,980,000
THE STIS INSTRUMENT IS AN ADVANCED TECHNOLOGY SCIENTIFIC-GRADE FLIGHT INSTRUMENT THAT WILL BE DESIGNED AND DEVELOPED TO OPERATE IN THE INTERPLANETARY ENVIRONMENT AT LAGRANGE L1 APPROXIMATELY 1M MILES FROM EARTH TOWARDS THE SUN ON THE EARTH-SUN LINE
openAug 31, 2026Up to $9,030,000
LOGISTICS MANAGEMENT SUPPORT SERVICES
openApr 30, 2026Up to $9,160,000
JPL SUPPORT TO THE HUMAN EXPLORATION AND OPERATIONS MISSION DIRECTORATE SYSTEMS ENGINEERING AND INTEGRATION OFFICE 40-109535
openSep 30, 2026Up to $9,150,000
THE MINIATURE RADIO FREQUENCY (MINI-RF) SYNTHETIC APERTURE RADAR INSTRUMENT'S TEAM (JHU/APL) WILL PERFORM BI-STATIC SYNTHETIC APERTURE RADAR OBSERVATIONS OF THE LUNAR SURFACE USING THE DEEP SPACE NETWORK'S DSS-13 APERTURE AS THE X-BAND TRANSMISSION.
openJul 31, 2028Up to $9,270,000
PER- AND POLYFLUOROALKYL SUBSTANCES PRELIMINARY OR SOLID WASTE MANAGEMENT UNIT (SWMU) ASSESSMENT AND SITE INVESTIGATION OR CONFIRMATION SAMPLING AT VARIOUS NASA CENTERS OR FACILITIES
openJun 30, 2026Up to $9,750,000
DEVELOPMENT OF HIGH STRENGTH CARBON NANOTUBE YARN FOR STRUCTURAL.COMPOSITES
openMay 31, 2026Up to $9,730,000
PERFLUOROALKYL (PER)- AND POLYFLUOROALKYL SUBSTANCES SITE ASSESSMENT AND MITIGATION AT KENNEDY SPACE CENTER, FLORIDA
openJun 30, 2026Up to $9,830,000
SIMULATION AND SUPPORT SERVICES FOR LANGLEY RESEARCH CENTER.
openNov 30, 2026Up to $9,900,000
PHASE III - FLY FOUNDATIONAL ROBOTS (FFR) DEVELOPMENT AND DEMONSTRATION MISSION
openJul 1, 2027Up to $10,000,000
JPL SUPPORT TO BLUE FED FOR HUMAN LANDING SYSTEM BASE PERIOD (40-109108)
openMay 1, 2027Up to $9,910,000
CROSS-SCALE INVESTIGATION OF EARTH'S MAGNETOTAIL AND AURORA (CINEMA) MISSION SUPPORT UNDER ARDES II 80MSFC20D0004
openJun 30, 2026Up to $10,130,000
PROVIDE CONTINUED MISSION OPERATIONS AND DATA PROCESSING SUPPORT SERVICES TO CONTINUE PERFORMING KEY CLIMATE MEASUREMENTS THROUGH TOTAL AND SPECTRAL SOLAR IRRADIANCE SENSOR SYSTEMS CURRENTLY IN OPERATION ON THE INTERNATIONAL SPACE STATION.
openJun 19, 2026Up to $10,120,000
THIS CONTRACT PROCURES ELECTRICITY (SUPPLY AND DELIVERY) FOR NASA'S GODDARD SPACE FLIGHT CENTER (GSFC) MAIN CAMPUS IN GREENBELT, MD AND RESPECTIVE AREAS 100, 200, 300, AND 400.
openNov 30, 2026Up to $10,370,000
SOLAR SYSTEM TREKS PROJECT 47-700074
openJan 31, 2028Up to $10,560,000
FILMSS 2 CODE S IDIQ TASK ORDER: TO PROVIDE PROGRAM, SCIENCE, ENGINEERING, OPERATIONS AND PROJECT MANAGEMENT SUPPORT FOR BIOSCIENCES FLIGHT DEVELOPMENT PROJECTS AND COLLABORATIVE SCIENCE PROGRAMS.
openNov 30, 2026Up to $10,920,000
TECHNICAL EVALUATION OF JPL SUPPORT OF NASA OFFICE OF STEM ENGAGEMENT PROGRAMS (18-710500)
openApr 30, 2026Up to $11,120,000
KSC ELECTRIC UTILITY SERVICE
openJun 30, 2027Up to $11,070,000
IND OMNIBUS SUPPORT AGREEMENT FOR NASA DIRECTED MISSIONS (91-210214)
openMar 27, 2027Up to $11,150,000
JPL SUPPORT TO THE LANDER TECHNOLOGY PROJECT 47-700008
openSep 30, 2026Up to $11,120,000
NASA NTSS CONTRACT YEAR 3 TASK ORDER
openSep 30, 2026Up to $11,350,000
IGF::OT::IGF "GLOBAL ECOSYSTEM DYNAMICS INVESTIGATION LIDAR (GEDI)" PRINCIPAL INVESTIGATOR (PI)SUPPORT FOR THE GLOBAL ECOSYSTEM DYNAMICS INVESTIGATION (GEDI) LIDAR INVESTIGATION. THE GEDI LIDAR INVESTIGATION WILL REQUIRE A LASER-BASED SYSTEM DEVELOPED AT NASA GODDARD SPACE FLIGHT CENTER (GSFC) TO OBSERVE THE STRUCTURE OF FOREST CANOPY. THE PROJECT WILL USE A LASER-BASED SYSTEM TO STUDY A RANGE OF CLIMATES, INCLUDING THE OBSERVATION OF THE FOREST CANOPY STRUCTURE OVER THE TROPICS, AND THE TUNDRA IN HIGH NORTHERN LATITUDES. THIS DATA WILL HELP SCIENTISTS BETTER UNDERSTAND THE CHANGES IN NATURAL CARBON STORAGE WITHIN THE CARBON CYCLE FROM BOTH HUMAN-INFLUENCED ACTIVITIES AND NATURAL CLIMATE VARIATIONS.
openSep 30, 2027Up to $11,440,000
NASA FIRE SERVICES CONTRACT - KSC PROGRAM MANAGEMENT AND BASELINE FIRE SERVICES FOR FY26
openSep 30, 2026Up to $11,460,000
COMPRESSOR STATION UPGRADES, PHASE 2
openApr 30, 2026Up to $11,670,000
FY24 SBIR PHASE III - SSPICY - STARFISH SPACE ORBITAL DEBRIS INSPECTION MISSION
openJun 15, 2027Up to $12,000,000
JPL SUPPORT OF DEEP ATMOSPHERE VENUS INVESTIGATION OF NOBLE GASES, CHEMISTRY, AND IMAGING PLUS (DAVINCI+) PROJECT PHASE B (40-109970)
openSep 27, 2026Up to $12,040,000
THE PURPOSE OF THIS CONTRACT IS TO ACQUIRE SCIENTIFIC SUPPORT AND RELATED SERVICES FOR THE GISS FACILITY IN NEW YORK CITY, NY.
openFeb 28, 2027Up to $12,350,000
EXOMARS TRACE GAS ORBITER (TGO) MISSION: PHASE A 60-15345
openOct 31, 2027Up to $12,520,000
JPL MULTIRESOLUTION GREENHOUSE SYSTEM (JPL-MGHG) WITH EMIT GREENHOUSE GAS CONTRIBUTION TO THE GHG CENTER (83-212606)
openSep 30, 2028Up to $12,380,000
DTN SPACE INTERNETWORKING 97-700078
openSep 26, 2027Up to $12,520,000
RENOVATE AEROSPACE GROUND EQUIPMENT (AGE) FACILITY CONSTRUCTION
openAug 10, 2026Up to $12,660,000
SIMULATION AND ADVANCED SOFTWARE SERVICES II (SASS II) TASK ORDER
openSep 30, 2030Up to $12,900,000
REPLACE ROOF AND ROOFTOP HEATING, VENTILATING AND AIR CONDITIONING (HVAC) EQUIPMENT ON THE BOOSTER FABRICATION FACILITY (BFF) COMPLEX MANUFACTURING AND ADMINISTRATION BUILDING.
openMay 22, 2026Up to $13,090,000
EO14042 PROVIDES THE DESIGN, ANALYSIS, FABRICATION, TESTING, QUALITY ASSURANCE, DOCUMENTATION, AND DELIVERY OF A PARACHUTE DECELERATOR SUBSYSTEM THAT WILL OFFER THE DECELERATION NECESSARY TO DELIVER THE DRAGONFLY MISSION LANDER TO SURFACE OF TITAN.
openApr 30, 2027Up to $13,310,000
RESEARCH AND ANALYSIS (R&A), HYDROLOGY AND WEATHER SCIENCE PROGRAM
openSep 26, 2027Up to $13,320,000
SBIR PHASE III - CREARE LLC - 90 K 30 W CRYOCOOLER DESIGN AND DEMONSTRATION
openOct 16, 2028Up to $13,170,000
DELIVERY ORDER FOR LIQUID NITROGEN FOR STENNIS SPACE CENTER (SSC) AS DESCRIBED ON KENNEDY SPACE CENTER'S (KSC'S) BASE CONTRACT.
openJun 30, 2029Up to $13,460,000
COMMERCIAL SATELLITE DATA ACQUISITION (CSDA) PROGRAM. TASK ORDER FOR ELECTRO OPTICAL TASKING DATA.
openNov 24, 2026Up to $13,500,000
AEROSPACE TESTING AND FACILITIES OPERATIONS AND MAINTENANCE (ATOM-5) - CTO 49
openDec 31, 2026Up to $13,470,000
RESEARCH OPPORTUNITIES FOR SPACE AND EARTH SCIENCES (ROSES)
openSep 30, 2028Up to $13,970,000
THE SPACE WEATHER FOLLOW ON (SWFO-L1) MISSION MAGNETOMETER SUITE (MAG) JOINT UNDERTAKING BETWEEN NASA AND NOAA.
openJun 30, 2026Up to $13,850,000
SBIR PHASE III XOGDOR VEHICLE ENHANCEMENTS
openAug 31, 2029Up to $14,000,000
LUNAR SURFACE INNOVATION INITIATIVE (LSII) UNDER ARDES II 80MSFC20D0004
openDec 31, 2026Up to $14,140,000
THIS EFFORT IS FOCUSED ON THE DEMONSTRATION AND CHARACTERIZATION OF A V-BAND CROSS-LINK CAPABILITY TO ALLOW NASA TO ASSESS THE POTENTIAL FOR V-BAND CROSS-LINKS TO ENABLE LOW LATENCY TRANSMISSION OF LARGE VOLUMES OF SCIENCE DATA.
openFeb 9, 2030Up to $14,220,000
THE OBJECTIVE OF THIS EFFORT IS TO PROVIDE NASA AND OTHER U.S. GOVERNMENT AGENCIES (WORKING THROUGH NASA) WITH A DOMESTIC, NORTHERN LATITUDE, SOUNDING ROCKET LAUNCH SITE FOR CONDUCTING SCIENTIFIC INVESTIGATIONS.
openNov 30, 2026Up to $14,470,000
STANDARDS THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNI
openSep 30, 2027Up to $14,520,000
ELECTRICITY SUPPLY & ANCILLARY SERVICES FOR JSC (JSC, EF, SCTF)
openJan 31, 2027Up to $14,430,000
ASTER SCIENCE TEAM LEAD 87-11798
openSep 30, 2028Up to $14,720,000
LASER PRESTABILIZATION SYSTEM (LPS) FOR THE LASER INTERFEROMETER SPACE ANTENNA (LISA) SYSTEM
openJan 29, 2027Up to $15,050,000
JOINT EUV CORONAL DIAGNOSTIC INVESTIGATION (JEDI) EFFORT. PHASE A WORK INCLUDES INSTRUMENT REQUIREMENTS DEFINITION, INSTRUMENT MANAGEMENT, SYSTEM ENGINEERING, INSTRUMENT SAFETY & MISSION ASSURANCE, AND SYSTEM INTEGRATION PLANNING.
openMay 23, 2026Up to $15,500,000
TEST OPERATIONS CONTRACT COVERS TEST OPERATIONS SUPPORT FOR TEST CUSTOMERS, AS WELL AS THE OPERATION AND TECHNICAL SYSTEMS MAINTENANCE OF THE HIGH PRESSURE INDUSTRIAL WATER, HIGH PRESSURE GAS, AND CRYO PROPELLANT STORAGE SUPPORT AREAS.
openJun 30, 2026Up to $15,400,000
ONE-METER CLASS DRILLING FOR PLANETARY EXPLORATION
openMay 30, 2026Up to $15,390,000
THE CONTRACTOR SHALL DESIGN, DEVELOP, AND DELIVER AN INSTRUMENT FOR THE LUNAR SURFACE ELECTROMAGNETICS EXPERIMENT AT NIGHT.
openSep 30, 2027Up to $15,510,000
SCIENCE MISSION DIRECTORATE, RESEARCH AND ANALYSIS FOR SPACE SCIENCE, TERRESTRIAL PLANETS AND LUNAR SCIENCE
openSep 30, 2028Up to $15,770,000
CONSTRUCTION PROJECT TO UPGRADE THE 22 KV ELECTRICAL DISTRIBUTION SYSTEM. ELECTRICAL INFRASTRUCTURE UPGRADES
openApr 9, 2026Up to $15,870,000
ADVANCED INFORMATION SYSTEMS TECHNOLOGY (AIST) 21 (87-200689)
openMay 31, 2026Up to $16,120,000
KENNEDY PROPELLANT AND LIFE SUPPORT SERVICES (KPLSS) II FY26 CUSTOMER FUNDING.
openSep 30, 2026Up to $15,960,000
THE GREAT OBSERVATORY MATURATION PROGRAM (GOMAP) (71-215312)
openSep 27, 2026Up to $16,000,000
BOOSTER FABRICATION FACILITY (BFF) INTERIORS RENOVATIONS, KENNEDY SPACE CENTER, FLORIDA
openFeb 26, 2027Up to $16,090,000
THE PURPOSE OF THIS NEGOTIATION IS TO DEFINITIZE THE UNIVERSITY OF NEW HAMPSHIRE (UNH) PROPOSAL FOR PHASE E EFFORT ON THE COSMIC RAY TELESCOPE FOR THE EFFECTS OF RADIATION (CRATER) INSTRUMENT FOR THE LUNAR RECONNAISSANCE ORBITER (LRO) PROJECT. THIS CONTRACT IS A RESULT OF A PI TRANSFER.
openAug 31, 2028Up to $16,240,000
AEROSPACE TESTING AND FACILITIES OPERATION AND MAINTENANCE - TASK IS TO PROVIDE SUPPORT FOR TEST PLANNING, TEST PREPARATION, TEST OPERATION, POST-TEST ACTIVATES, FACILITY OPERATION, SYSTEMS.
openJun 1, 2026Up to $16,510,000
PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT 15-15038
openSep 30, 2028Up to $16,570,000
THIS COSMIC TASK ORDER IS CREATED FOR FUNDING OF THE COSMIC CORE SERVICES FOR COST PRICE INCENTIVE FEE CLIN 1004 OF 80SSC025D0001.
openSep 30, 2026Up to $17,140,000
REPLACE NEIL ARMSTRONG OPERATIONS AND CHECKOUT (O&C) SOUTH WING ELECTRICAL DISTRIBUTION EQUIPMENT AT KENNEDY SPACE CENTER, FL.
openOct 6, 2028Up to $17,410,000
TECHNICAL WORKFORCE EDUCATION AND EXPERTISE DEVELOPMENT SERVICES (TWEEDS) IN SUPPORT OF THE APPEL KS PROGRAM
openOct 31, 2026Up to $17,390,000
TEST ARTICLE - IF MORE INFORMATION IS NEEDED, PLEASE CONTACT THE CO DIRECTLY.
openMar 31, 2027Up to $17,530,000
COMBINED OPERATIONS, SERVICES, MAINTENANCE, AND INFRASTRUCTURE CONTRACT (COSMIC) BASE YEAR - CORE COST-PLUS INCENTIVE FEE (CPIF) FUNDING ORDER
openSep 30, 2026Up to $17,830,000
DEEP SPACE LOGISTICS ENGINEERING SUPPORT (LENS) TASK ORDER ISSUED UNDER THE GENERAL SERVICES ADMINISTRATION (GSA) ONE ACQUISITION SOLUTION FOR INTEGRATED SERVICES (OASIS).
openNov 29, 2026Up to $17,700,000
SENTINEL-6C PREPARATORY PROJECT (89-210199)
openApr 30, 2026Up to $18,120,000
THIS CONTRACT PROVIDES ASSISTANCE IN MEETING THE OBJECTIVES OF THE GSFC ENVIRONMENTAL MANAGEMENT PROGRAM.
openJul 31, 2026Up to $18,170,000
ELECTRIC PROPULSION SUPPORT TO THE ADVANCED ELECTRIC PROPULSION SYSTEM (AEPS) ACQUISITION AND DELIVERY THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILI
openSep 30, 2028Up to $18,560,000
JPL SUPPORT TO SPACEX FOR HUMAN LANDING SYSTEM BASE PERIOD (40-109107)
openNov 15, 2027Up to $18,950,000
INFRARED SCIENCE ARCHIVE (IRSA) THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNME
openSep 30, 2026Up to $18,820,000
KECK SINGLE APERTURE (KSA) OPERATIONS 79-15015
openSep 30, 2028Up to $19,000,000
COMMERCIAL LUNAR PAYLOAD SERVICES (CLPS)
openAug 31, 2028Up to $88,030,000
SPECTRUM THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNIQ
openSep 30, 2028Up to $20,010,000
COST-PLUS FIXED FEE (CPFF) IDIQ TASK ORDER UNDER INTELLIGENT SYSTEMS RESEARCH AND DEVELOPMENT SUPPORT-3 CONTRACT NO. 80ARC020D0010 TO PROVIDE TECHNICAL ADVANCEMENT TO SUPPORT THE INTELLIGENT SYSTEM DIVISION AT ARC.
openApr 30, 2026Up to $20,260,000
NASA ADVANCED SUPER COMPUTING (NACS) GSFC PROCUREMENT TASK ORDER (OY7/CY8)
openJun 30, 2026Up to $20,630,000
MISSION ENABLING SERVICES CONTRACT (MESC) BASELINE A -NASA AIRCRAFT MANAGEMENT INFORMATION SYSTEM (NAMIS)
openSep 30, 2027Up to $21,010,000
EZIE: ELECTROJET ZEEMAN IMAGING EXPLORER 71-107848
openApr 30, 2027Up to $21,660,000
HELIOSWARM PROGRAM SUPPORT
openAug 31, 2026Up to $11,970,000
SPACE SCIENCE & TECHNOLOGY EVALUATION FACILITY FIRST FLIGHT. A GENERAL-PURPOSE LUNAR TESTBED PROVIDING POWER AND DATA SERVICES TO INDIVIDUAL EXPERIMENTS/PAYLOADS FOR TESTING AT LUNAR SURFACE
openAug 10, 2026Up to $22,100,000
U.S. PARTICIPATION IN RADAR FOR ICY MOON EXPLORATION (RIME) INSTRUMENT DEVELOPMENT FOR JUPITER ICY MOON EXPLORER (JUICE) 42-19087
openSep 30, 2028Up to $22,110,000
AVIATION LOGISTICS OPERATIONS FACILITY (ALOF) DESIGN-BUILD
openApr 14, 2027Up to $22,250,000
CONSTRUCTION OF CENTER FACILITY SUPPORT BUILDING - BUILDING 22
openSep 15, 2026Up to $22,040,000
ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) 50-13143
openSep 30, 2028Up to $22,860,000
JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY (JHU/APL) SUPPORTS PLANETARY SCIENCE WORK IN NASA'S RADIOISOTOPE POWER SYSTEMS (RPS) PROGRAM AND ITS CONSTITUENT PROJECTS, AND NASA'S PLANETARY EXPLORATION SCIENCE TECHNOLOGY OFFICE (PESTO).
openApr 30, 2026Up to $22,670,000
JPL SUPPORT TO THE HUMAN LANDING SYSTEM (HLS) PROGRAM (40-108827)
openSep 26, 2027Up to $22,450,000
ENGINEERING SERVICES
openDec 31, 2027Up to $22,540,000
PHASE III - CAPSTONE EXTENDED MISSION
openSep 30, 2026Up to $23,540,000
MISSION OPERATIONS SUPPORT FOR AQUILLA II SPACECRAFT
openJun 30, 2026Up to $23,070,000
THE CONTRACTOR WILL PROVIDE THE PRODUCTS AND SERVICES TO SUPPORT THE JAMES WEBB SPACE TELESCOPE PHASE E OPERATIONS AND SUSTAINMENT.
openJun 24, 2027Up to $23,830,000
SPACE TECHNOLOGY - (SPACETECH - REDDI- 2020), 80HQTR20NOA01 AMENDMENT1, "UTILIZING PUBLIC-PRIVATE PARTNERSHIPS TO ADVANCE TIPPING POINT TECHNOLOGIES"...ETA SPACE, LLC. - LOXSAT 1
openApr 27, 2027Up to $24,250,000
SAFETY AND MISSION ASSURANCE SUPPORT SERVICES (SMASS) IV
openSep 30, 2026Up to $25,080,000
LAUNCH CONTROL CENTER AND VEHICLE ASSEMBLY BUILDING HEATING VENTILATION AND AIR CONDITIONING REPLACEMENT.
openApr 30, 2027Up to $25,140,000
THE PURPOSE OF THIS TASK ORDER IS TO REPLACE THE ROOF OF THE MAIN MANUFACTURING BUILDING AT MICHOUD ASSEMBLY FACILITY, BUILDING 103, WHICH SUPPORTS SPACE LAUNCH SYSTEM (SLS) AND ORION MANUFACTURING.
openJun 19, 2028Up to $25,900,000
IGF::OT::IGF BAA - NEXT SPACE TECHNOLOGIES FOR EXPLORATION PARTNERSHIPS (NEXTSTEP) PROPOSAL - HABITATION. NASA HAS INCREASINGLY EMBRACED PUBLIC-PRIVATE PARTNERSHIPS FOR ACHIEVING ITS STRATEGIC GOALS AND OBJECTIVES FOR EXPANDING THE FRONTIERS OF KNOWLEDGE, CAPABILITY, AND OPPORTUNITIES IN SPACE. THE NEXT STEP FOR HUMAN SPACEFLIGHT IS THE DEVELOPMENT OF DEEP SPACE EXPLORATION CAPABILITIES TO SUPPORT MORE EXTENSIVE MISSIONS IN THE PROVING GROUND AROUND AND BEYOND CISLUNAR SPACE. AN IMPORTANT PART OF NASAS STRATEGY IS TO STIMULATE THE COMMERCIAL SPACE INDUSTRY WHILE LEVERAGING THOSE SAME COMMERCIAL CAPABILITIES THROUGH FUTURE CONTRACTS AND PUBLIC-PRIVATE PARTNERSHIPS TO DELIVER MISSION CAPABILITIES. NASAS ACTIVITIES IN ENABLING THE PIONEERING OF SPACE ARE BEING DRIVEN BY A SET OF GUIDING PRINCIPLES: IMPLEMENTABLE IN THE NEAR-TERM WITH THE BUYING POWER OF CURRENT BUDGETS AND IN THE LONGER TERM WITH BUDGETS COMMENSURATE WITH ECONOMIC GROWTH; EXPLORATION ENABLES SCIENCE AND SCIENCE ENABLES EX
openApr 30, 2026Up to $25,670,000
ICE, CLOUD, AND LAND ELEVATION-2 (ICESAT-2) MISSION OPERATIONS CENTER (MOC) SUPPORT CENTER CONTRACT - PROVIDE HIGHLY SPECIALIZED ENGINEERING SERVICES FOR MISSION OPERATIONS SUPPORT TO MEET ICESAT-2 SCIENCE OBJECTIVES.
openNov 14, 2026Up to $27,380,000
WIDEBAND TERMINAL FLIGHT DEMONSTRATION TASK ORDER UNDER 80MSFC20D0004 AEROSPACE RESEARCH, DEVELOPMENT AND ENGINEERING SUPPORT (ARDES) II.
openApr 30, 2027Up to $28,310,000
SCIENCE MISSION DIRECTORATE, EARTH SCIENCE APPLIED SCIENCE PROGRAM THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PR
openAug 30, 2026Up to $27,690,000
MARS TECHNOLOGY DEVELOPMENT 60-17814
openSep 30, 2028Up to $29,820,000
SBIR PHASE III - 80NSSC25C0510 - SWIFT SALVO
openSep 1, 2026Up to $29,800,000
SPACE WEATHER CORONAGRAPH - EFFORTS INCLUDE INTEGRATE, TEST, CALIBRATE, EVALUATE, AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE CORONAGRAPH INSTRUMENTS.
openJan 31, 2034Up to $30,300,000
SPECIAL STUDIES
openSep 27, 2029Up to $30,430,000
"IGF::OT::IGF" OTHER FUNCTIONS - TROPOSPHERIC EMISSIONS: MONITORING OF POLLUTION (TEMPO) - THE TEMPO INVESTIGATION WAS SELECTED UNDER THE NASA SECOND STAND ALONE MISSIONS OF OPPORTUNITY NOTICE (SALMON-2) ANNOUNCEMENT OF OPPORTUNITY (AO) PROGRAM ELEMENT APPENDIX J, NNH12ZDA006O-EVI1 FOR THE EARTH VENTURE INSTRUMENT-1 (EVI-1) ELEMENT OF THE EARTH SYSTEM SCIENCE PATHFINDER (ESSP) PROGRAM OFFICE'S EARTH VENTURE LINE. TEMPO MEASURES POLLUTION OF NORTH AMERICA, FROM MEXICO CITY TO THE CANADIAN TAR/OIL SANDS, AND FROM THE ATLANTIC TO THE PACIFIC, HOURLY AND AT HIGH SPATIAL RESOLUTION. TEMPO SPECTROSCOPIC MEASUREMENTS IN THE ULTRAVIOLET AND VISIBLE AND PROVIDES A TROPOSPHERIC MEASUREMENT SUITE THAT INCLUDES THE KEY ELEMENTS OF TROPOSPHERIC AIR POLLUTION CHEMISTRY. MEASUREMENTS ARE FROM GEOSTATIONARY ORBIT, TO CAPTURE THE INHERENT HIGH VARIABILITY IN THE DIURNAL CYCLE OF EMISSIONS AND CHEMISTRY. A SMALL PRODUCT SPATIAL FOOTPRINT RESOLVES POLLUTION SOURCES AT SUB-URBAN SCALE. TOGETHER, THIS TEMP
openMar 31, 2028Up to $31,190,000
DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
openSep 30, 2028Up to $32,060,000
ETA
openSep 30, 2028Up to $31,180,000
VENTURE-CLASS ACQUISITION OF DEDICATED AND RIDESHARE (VADR) UMBRELLA TASK ORDER
openFeb 3, 2027Up to $24,170,000
MULTIANGLE IMAGING SPECTRORADIOMETER (MISR) INSTRUMENT SUPPORT AND GEOPHYSICAL DATA PRODUCT VERIFICATION REFINEMENT AND VALIDATION 83-8225
openJun 30, 2026Up to $32,450,000
THIS TASK ORDER IS FOR MICROSOFT M365 G5 LICENSES PER ATTACHED QUOTE # MTG-NASA-MIC-05249 DATED 04/23/2025. THE TASK ORDER INCORPORATES FAR 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT.
openApr 30, 2026Up to $33,260,000
THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH.
openMay 31, 2028Up to $32,530,000
ENTERPRISE INFRASTRUCTURE SOLUTIONS (EIS) - MISSION
openSep 30, 2026Up to $34,040,000
DEMOLITION OF BUILDING 1100 CENTER SECTION AND WEST WING AT STENNIS SPACE CENTER, MS
openFeb 15, 2029Up to $33,800,000
FY22 SBIR PHASE III - DESIGN, DEVELOPMENT, FABRICATION TESTING, AND DELIVERY OF LUNAR CONSTRUCTION SYSTEM FOR DEMONSTRATION
openMar 28, 2028Up to $33,370,000
THIS PROCUREMENT PROVIDES FOR THE LABOR, TRAVEL AND ASSOCIATED BURDENS NECESSARY TO SATISFY THE PHASE A CONCEPT STUDY REPORT (CSR) AND BRIDGE PHASE B OPTION REQUIREMENTS OF NASA'S COMPETITIVELY SELECTED DAVINCI+ MISSION.
openOct 31, 2026Up to $34,380,000
ECOSYSTEMS SPACEBORNE THERMAL RADIOMETER EXPERIMENTS ON SPACE STATION (ECOSTRESS) 87-19641
openMar 28, 2027Up to $35,120,000
STROFIO - PHASE B IS AWARDED FROM ANNOUNCEMENT OF OPPORTUNITY (AO) NNM08ZDA009O, STAND ALONE MISSION OF OPPORTUNITY NOTICE (SALMON) ISSUED BY NASA HEADQUARTERS. SOUTHWEST RESEARCH INSTITUTE (SWRI) WAS SELECTED FOR "STROFIO: EXOSPHERIC SAMPLING OF MERCURY'S SURFACE COMPOSITION" WITH DR. STEFANO LIVI AS THE PRINCIPAL INVESTIGATOR FOR FUNDING AND APPROVED TO DIRECTLY ENTER PHASE B PRELIMINARY DESIGN AND TECHNOLOGY COMPLETION. STROFIO WAS SELECTED BECAUSE IT IS TIMELY AND TAKES ADVANTAGE OF A UNIQUE OPPORTUNITY FOR NASA TO PARTICIPATE THROUGH THIS INVESTIGATION IN THE BEPICOLOMBO MISSION. THE ANTICIPATED OBSERVATIONS OF MERCURY'S EXOSPHERE WILL BE UNIQUE AND COMPLEMENTARY TO INVESTIGATIONS CONDUCTED BY MARINER, MESSENGER AND THE OTHER INSTRUMENTS ON BEPICOLOMBO. THE PROPOSED INVESTIGATION WILL PROVIDE VALUABLE INFORMATION ABOUT MERCURY'S EXOSPHERE AND ITS INTERACTION WITH THE MAGNETOSPHERE AND SURFACE. THE STROFIO INSTRUMENT WILL PROVIDE A VALUABLE SCIENTIFIC RETURN, ADDRESSING MANY GOALS
openApr 30, 2028Up to $34,530,000
ACQUIRE SERVICES FOR THE CONTINUED DEVELOPMENT AND OPERATION OF THE SYNTHETIC APERTURE RADAR DISTRIBUTED ACTIVE ARCHIVE CENTER FOR NASAS EARTH OBSERVING SYSTEM DATA AND INFORMATION SYSTEM.
openJun 30, 2026Up to $36,210,000
PHASE A/B DEVELOPMENT OF THE JUICE ULTRAVIOLET SPECTROGRAPH IGF::CT,CL::IGF THE EUROPEAN SPACE AGENCY SELECTED THE JUPITER ICY MOONS EXPLORER (JUICE) MISSION AS THE FIRST MISSION IN ITS LARGE-CLASS MISSION PORTFOLIO UNDER THE COSMIC VISION PROGRAM. THE JUICE MISSION WILL INVESTIGATE JUPITER AND ITS ICY MOONS, COMPLETING ITS MISSION BY ORBITING GANYMEDE. THE MISSION IS PLANNED FOR LAUNCH IN 2022. THE NASA SCIENCE MISSION DIRECTORATE (SMD) HAS OFFERED TO COLLABORATE IN THIS MISSION. IN 2012, NASA ISSUED PROGRAM ELEMENT APPENDIX (PEA) K AS AN APPENDIX OF THE SECOND STAND ALONE MISSIONS OF OPPORTUNITY NOTICE (SALMON-2)(NNH12ZDA006O-JUICE) ANNOUNCEMENT OF OPPORTUNITY (AO)(NNH12ZDA006O) FOR THE PURPOSE OF SOLICITING PROPOSALS FOR JUICE MISSION OF OPPORTUNITY (MO) INVESTIGATIONS TO BE MANAGED UNDER THE NASA NEW FRONTIERS PROGRAM. THE JUICE ULTRAVIOLET IMAGING SPECTROGRAPH (JUICE-UVS) IS A COMPLETE, STAND-ALONE INSTRUMENT PROPOSED AND SELECTED UNDER THE SALMON-2 AO, TO BE INCLUDED IN THE ESA J
openSep 30, 2036Up to $37,560,000
PREFIRE (POLAR RADIANT ENERGY IN THE FAR INFRARED EXPERIMENT THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILIT
openMar 31, 2028Up to $37,130,000
PROVIDE ENGINEERING ANALYSES, HARDWARE & SOFTWARE DEVELOPMENT, FABRICATION, INTEGRATION, TEST, EVALUATION, INTEGRATION WITH SPACECRAFT, LAUNCH, INSTRUMENT ACTIVATION, CALIBRATION, VALIDATION, & OPERATIONS THROUGH 60-DAY CHECKOUT FOR TSIS2 PAYLOAD.
openDec 12, 2026Up to $36,970,000
LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
openSep 30, 2028Up to $37,450,000
THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT.
openMar 31, 2027Up to $40,060,000
IGF::CT::IGF THIS "TASK ORDER" HAS BEEN CREATED IN THE CONTRACT MANAGEMENT MODULE (CMM) SYSTEM FOR FUNDING PURPOSES ONLY AND IS NOT AN ACTUAL TASK ORDER WITH A STATEMENT OF WORK AND OTHER TASK ORDER REQUIREMENTS. THIS "TASK ORDER" HAS BEEN CREATED FOR FUNDING OBLIGATIONS ONLY AND TO ACCOUNT FOR CMM AND SAP FINANCIAL SYSTEM FUNCTIONALITY. THIS "TASK ORDER" IS TO FUND NNL13AA14C CLIN 3 (ENGINEERING). CENTER MAINTENANCE, OPERATIONS, AND ENGINEERING (CMOE) CONTRACT. REQUIREMENT FOR THE MAINTENANCE, OPERATIONS, AND ENGINEERING OF LARC'S INSTITUTIONAL FACILITIES AND HIGHLY TECHNICAL RESEARCH FACILITIES FOR MISSION SUCCESS. THE CMOE CONTRACT WILL PROVIDE CORE SUPPORT SERVICES TO LARC IN THE AREAS OF INSTITUTIONAL AND RESEARCH OPERATIONS, MAINTENANCE, AND ENGINEERING (OME). THESE TECHNICAL SERVICES INCLUDE: RESEARCH FACILITIES OPERATIONS (E.G., HIGHLY SPECIALIZED WIND TUNNELS, LABORATORIES, TEST STANDS, INSTRUMENTATION CALIBRATION/REPAIR); CENTRAL UTILITIES OPERATIONS (E.G., STEAM, COMPRESSED
openJul 31, 2026Up to $38,330,000
CASE: CONTRIBUTION TO ARIEL SPECTROSCOPY OF EXOPLANETS 71-700092
openJun 30, 2030Up to $39,770,000
IDIQ PROCUREMENT SERVICES TASK ORDER UNDER NASA ADVANCED COMPUTING SERVICES (NACS) CONTRACT.
openJun 30, 2026Up to $40,020,000
CHARLES CONTRACT TO PROVIDE SUPPORT FOR AIRCRAFT AT LARC. INCLUDES AIRCRAFT MAINTENANCE, FLIGHT OPERATIONS, ENGINEERING, LIFECYCLE, QUALITY, SAFETY, AND OTHER RELATED SUPPORT FOR A VARIETY OF AIRFRAMES, ENGINES, APPLIANCES, AND SUPPORT EQUIPMENT
openFeb 28, 2027Up to $39,460,000
THIS COSMIC TASK ORDER IS CREATED FOR FUNDING OF THE COST-PLUS-INCENTIVE-FEE CLIN 9002 OF 80SSC025D0001.
openSep 30, 2033Up to $39,000,000
MICROWAVE LIMB SOUNDER (MLS) MISSION OPERATIONS 88-9539
openJun 30, 2026Up to $41,130,000
TO PROVIDE SPACECRAFT DEVELOPMENT & TEST OBSERVATORY I&T OBSERVATORY TESTING SHIPMENT TO THE LAUNCH SITE SUPPORT OF LAUNCH OPERATIONS ON-ORBIT PERFORMANCE VERIFICATION OPERATION OF MISSION OPERATIONS CENTER, 3 YEARS MISSION OPS&DECOMMISSIONING.
openOct 27, 2026Up to $42,940,000
SYSTEMS ENGINEERING FOR SPACE MODERNIZATION INITIATIVE DIRECT MISSION SUPPORT
openJun 8, 2026Up to $42,430,000
IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT
openJun 9, 2039Up to $44,030,000
GODDARD LOGISTICS SERVICES CONTRACT - THE PRINCIPAL PURPOSE OF THIS REQUIREMENT IS TO SUPPORT NASA GSFC LOGISTICS MANAGEMENT NEEDS IN ORDER TO MEET EARTH SCIENCE, SPACE SCIENCE, AND EXPLORATION MISSION REQUIREMENTS.
openJul 31, 2026Up to $44,020,000
RESEARCH AND ANALYSIS (R&A), TERRESTRIAL ECOLOGY AND CARBON CYCLE SCIENCE
openSep 26, 2027Up to $45,270,000
IGF::CL,CT::IGF PSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT O
openAug 31, 2032Up to $45,230,000
NASA-WIDE SPECIALIZED ENGINEERING, EVALUATION AND TEST SERVICES (NSEETS).
openSep 30, 2028Up to $45,770,000
EXOPLANET EXPLORATION (EXEP) PROGRAM OFFICE (73-108020)
openSep 30, 2028Up to $45,930,000
RESEARCH AND ANALYSIS (R&A), EARTH SYSTEM MODELING AND ANALYSIS
openSep 26, 2027Up to $47,100,000
SOLAR B X RAY TELESCOPE PHASE E
openJun 30, 2026Up to $46,570,000
NRESS-II MANAGEMENT AND IT SUPPORT
openJul 31, 2026Up to $47,760,000
ATMOSPHERIC INFRARED SOUNDER (AIRS) ADVANCED MICROWAVE SOUNDING UNIT (AMSU) HUMIDITY SOUNDER FROM BRAZIL (HSB) PROJECT TEAM LEADER FACILITY 88-8223
openSep 30, 2026Up to $47,430,000
DEVELOPMENT OF THE QUICKSOUNDER SC AND THE QUICKSOUNDER SATELLITE, INTEGRATION OF THE ATMS EDU, SHIPMENT TO THE LAUNCH SITE SUPPORT OF LAUNCH OPS & SATELLITE ACTIVATION, 3 YRS OF MISSION OPS & PERFORM DECOMMISSIONING OPERATION
openAug 29, 2029Up to $49,040,000
JPL PLANETARY DATA SYSTEMS (PDS) NODES AND SUB-NODES (93-109847)
openSep 20, 2027Up to $48,970,000
RUSSIAN LANGUAGE AND LOGISTICS SERVICES.
openSep 30, 2026Up to $48,330,000
INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) IS A WATERSHED MISSION THAT SIMULTANEOUSLY INVESTIGATES THE ACCELERATION OF ENERGETIC PARTICLES AND INTERACTION OF THE SOLAR WIND WITH THE LOCAL INTERSTELLAR MEDIUM. IMAP WILL 1) ADVANCE THE UNDERSTANDING OF THE TEMPORAL AND SPATIAL EVOLUTION OF THE BOUNDARY REGION IN WHICH THE SOLAR WIND AND INTERSTELLAR MEDIUM INTERACT, 2) IDENTIFY AND ADVANCE THE UNDERSTANDING OF PROCESSES RELATED TO THE INTERACTIONS OF THE MAGNETIC FIELD OF THE SUN AND THE LOCAL INTERSTELLAR MEDIUM, 3) IMPROVE THE UNDERSTANDING OF THE COMPOSITION AND PROPERTIES OF THE LOCAL INTERSTELLAR MEDIUM, AND 4) IDENTIFY AND ADVANCE THE UNDERSTANDING OF PARTICLE INJECTION AND ACCELERATION PROCESSES NEAR THE SUN, IN THE HELIOSPHERE AND HELIOSHEATH. IMAP IS BASED ON A COMPLETE AND SYNERGISTIC SET OF OBSERVATIONS. IN SITU AT 1AU, THIS REQUIRES DETAILED OBSERVATIONS OF THE SOLAR WIND ELECTRONS AND IONS SUPRATHERMAL, PICKUP, AND ENERGETIC ION POPULATIONS AND MAGNETIC FIELD. FOR TH
openJul 31, 2026Up to $49,410,000
UNINHABITED AERIAL VEHICLE SYNTHETIC APERTURE RADAR OPERATIONS (UAVSAR) 87-12820
openSep 30, 2028Up to $52,780,000
RESEARCH AND ANALYSIS (R&A), SOLID EARTH AND NATURAL HAZARDS SCIENCES AND APPLICATIONS
openSep 26, 2027Up to $52,240,000
THE ULTRAVIOLET EXPLORER (UVEX)
openDec 31, 2026Up to $53,530,000
CLOUDSAT PHASE E MISSION OPERATIONS 88-11198
openSep 30, 2026Up to $55,540,000
ORBITING CARBON OBSERVATORY-3 85-16363
openSep 30, 2028Up to $54,790,000
RESEARCH AND ANALYSIS (R&A), EARTH SCIENCE ATMOSPHERIC COMPOSITION
openSep 26, 2027Up to $58,860,000
COMMERCIAL LUNAR PAYLOAD SERVICES (CLPS) CONTRACT TASK ORDER CS-6.
openApr 2, 2030Up to $57,540,000
EXTREME ULTRAVIOLET VARIABILITY EXPERIMENT (EVE) FOR THE SOLAR DYNAMICS OBSERVATORY(SDO)
openSep 30, 2027Up to $58,360,000
COMMERCIAL LUNAR PAYLOAD SERVICES (CLPS)TASK ORDER CP-12 CLPS PAYLOADS AND RESEARCH INVESTIGATIONS ON THE SURFACE OF THE MOON
openApr 30, 2026Up to $56,930,000
NASA ROSALIND FRANKLIN MISSION PROJECT (40-712104)
openSep 30, 2028Up to $62,210,000
MISSION SYSTEMS ENGINEERING AND PAYLOAD AND INSTRUMENT SYSTEMS ENGINEERING SERVICES AS WELL AS GUIDANCE, NAVIGATION, AND CONTROL SYSTEMS SERVICES, WHICH INCLUDES GUIDANCE, NAVIGATION AND CONTROL (GN&C) SYSTEMS ENGINEERING AND ATTITUDE CONTROL SYSTEMS
openNov 30, 2028Up to $60,220,000
RESEARCH FACILITIES AND ENGINEERING SUPPORT SERVICES (RF&ESS)
openJul 4, 2026Up to $60,540,000
ESCAPE AND PLASMA ACCELERATION AND DYNAMICS EXPLORERS (ESCAPADE) MISSION -.PHASE A CONCEPT STUDY.
openAug 31, 2026Up to $65,010,000
IGF::CL,CT::IGF LUCY IS A PLANNED NASA SPACE PROBE THAT WILL TOUR FIVE JUPITER TROJANS, ASTEROIDS WHICH SHARE JUPITER'S ORBIT AROUND THE SUN, ORBITING EITHER AHEAD OF OR BEHIND THE PLANET AND ONE MAIN BELT ASTEROID. ALL TARGET ENCOUNTERS WILL BE FLY-BY ENCOUNTERS.
openFeb 28, 2034Up to $68,420,000
EUCLID PROJECT 70-16372
openSep 30, 2028Up to $70,540,000
NASA AGENCYWIDE COMMUNICATION SERVICES INCLUDING, BUT NOT LIMITED TO, STRATEGIC COMMUNICATIONS/PLANNING/INTEGRATION, STAKEHOLDER RELATIONS/PUBLIC ENGAGEMENT, MEDIA RELATIONS, HISTORY AND ARCHIVES, LIBRARY SERVICES.
openMay 31, 2026Up to $69,060,000
Fission Surface Power System - Technical Library
YesRolling
TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Passive Nutrient Delivery System (PONDS) (KSC-TOPS-81)
YesJul 17, 2026
TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Passive Porous Tube Nutrient Delivery System (KSC-TOPS-73)
YesJul 17, 2026
TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Plasma Processing of Water and Inedible Biomass for pH Control and Nutrient Recycling (KSC-TOPS-94)
YesJul 17, 2026
TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Secure Optical Quantum Communications (LEW-TOPS-108)
YesJul 17, 2026
TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Boosting Quantum Communication Efficiency (LEW-TOPS-178)
YesJul 17, 2026
TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Optical De-Multiplexing Method for QKD Encryption (LEW-TOPS-163)
YesJul 17, 2026
TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Capacitive Micro-Gravity Fluid Mass Gauge (KSC-TOPS-96)
YesJul 17, 2026
TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Coil-On-Plug Igniter for Reliable Engine Starts (MSC-TOPS-105)
YesJul 17, 2026
Commercial Low Earth Orbit (LEO) Development Program Phase 2 Directive Clarifications
YesRolling
Commercial Low Earth Orbit (LEO) Destination Contract (CLDC) Technical Library
YesRolling
TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: RFID Range Extension and Priority Data Forwarding (MSC-TOPS-128)
YesJul 17, 2026
TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Multi-Link Spherical Joint (MSC-TOPS-109)
YesJul 17, 2026
TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Triggering Li-ion Battery Cells with Laser Radiation (MSC-TOPS-99)
YesJul 17, 2026
TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Portable Microscope (MSC-TOPS-131)
YesJul 17, 2026
TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Enhanced Software Suite Maximizes Non-Destructive Evaluation (NDE) Methods (MSC-TOPS-34)
YesJul 17, 2026
TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Coil-On-Plug Igniter for Reliable Engine Starts (MSF-TOPS-105)
YesJul 17, 2026
RESEARCH OPPORTUNITIES IN SPACE AND EARTH SCIENCES (ROSES) 2025
YesSep 9, 2026
CIS Capability Studies IV: Lunar and Mars Communication Architectures (NextSTEP-3: Appendix C)
YesRolling
Near Space Network Services - Contract Award (Subcat 2.2 GEO to Cislunar Relay Services))
YesRollingUp to $4,820,000,000
Next Space Technologies for Exploration Partnerships -3 (NextSTEP-3) Omnibus
YesRolling
Research Opportunities for International Space Station (ISS) Utilization
YesSep 30, 2029
Funder Overview
Total Opportunities340
Grants2
Contracts338
Track this funder
Sign up to manage your relationship, add notes, and get notified about new opportunities.
Sign Up Free