Funding Organization

National Aeronautics and Space Administration

340 opportunities

About

No description available for this funder.

Contracts (338)

RISK REDUCTION AND PHASE B EFFORT IN SUPPORT OF THE MARS ATMOSPHERIC AND VOLATILE EVOLUATION (MAVEN) PROJECT. THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE MAVEN PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM, WHICH CONSISTS OF THE INTEGRATED SPACECRAFT AND SCIENCE PAYLOADS IN ACCORDANCE WITH THE STATEMENT OF WORK.

open
Sep 30, 2026Up to $300,980,000

EXTRAVEHICULAR ACTIVITY (EVA) DEMONSTRATION

open
Aug 9, 2028Up to $93,160,000

DEEP SPACE OPTICAL COMMUNICATIONS (DSOC) FLIGHT TERMINAL PROJECT THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJ

open
Jan 31, 2027Up to $134,440,000

SPACE WEATHER FOLLOW ON - LAGRANGE 1 (SWFO-L1) SPACECRAFT

open
Jun 30, 2026Up to $104,050,000

TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS.

open
May 31, 2027Up to $108,700,000

RESEARCH AND ANALYSIS (R&A), EARTH SCIENCE, CLIMATE VARIABILITY AND CHANGE

open
Sep 24, 2028Up to $108,920,000

PLANETARY SCIENCE PROGRAM SUPPORT 40-15961

open
Sep 26, 2027Up to $106,910,000

KENNEDY EXPLORATION GROUND SYSTEMS (EGS) PROGRAM (LX) SUPPORT SERVICES CONTRACT THREE (KLXS III).

open
Sep 30, 2026Up to $111,280,000

EMIT (EARTH SURFACE MINERAL DUST SOURCE INVESTIGATION) THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPON

open
Sep 30, 2028Up to $109,210,000

COMMERCIAL LUNAR PAYLOAD SERVICES (CLPS) TASK ORDER CS-3

open
Aug 31, 2027Up to $112,770,000

PLANETARY SCIENCE DIVISION, CONCEPT STUDIES FOR PLANETARY INSTRUMENTS

open
Sep 30, 2028Up to $114,070,000

IGF::CL::IGF IMAGING X-RAY POLARIMETRY EXPLORER (IXPE) PHASE A

open
Jan 31, 2027Up to $116,280,000

THE COMPTON SPECTROMETER AND IMAGER (COSI)

open
Sep 30, 2027Up to $117,730,000

NASA HEADQUARTERS (HQ) MANAGES THE MARS EXPLORATION PROGRAM (MEP), WHICH SELECTED THE MARS ATMOSPHERE AND VOLATILE EVOLUTION (MAVEN) PROJECT AS A MARS SCOUT MISSION. THE MAVEN PRINCIPAL INVESTIGATOR (PI) IS DR. BRUCE JAKOSKY, OF THE UNIVERSITY OF COLORADO, LABORATORY FOR ATMOSPHERIC AND SPACE PHYSICS (LASP) IN BOULDER, CO. THE PI WILL HAVE OVERALL CONTROL OF THE MAVEN PROJECT. HE WILL PROVIDE SCIENCE LEADERSHIP FOR THE MAVEN MISSION AND MANAGE EDUCATION AND PUBLIC OUTREACH. THIS EFFORT APPLIES TO LASP AND COVERS PHASES A, B, C, D, AND E OF THE MAVEN MISSION. UNDER PHASE A OF THIS CONTRACT, THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULE MANAGEMENT, PROVIDING TECHNICAL PROGRESS REPORTS, AND MISSION REVIEWS. UNDER PHASE B, THE CONTRACTOR IS RESPONSIBLE FOR SUPPORTING REQUIREMENTS ANALYSIS, PROJECT PLANS, PRELIMINARY DESIGN REVIEWS, MONTHLY STATUS REVIEWS, QUARTERLY TEAM MEETINGS, E/PO ACTIVITIES, AND THE PRELIMINARY SCIENCE DATA MANAGEMENT PLAN. UNDER PHASES C AND D, THE CONTRACTOR IS RESPONS

open
Jan 31, 2029Up to $117,280,000

HHPC2 TO

open
Sep 30, 2026Up to $117,450,000

DRAGONFLY RELOADABLE LANDER TO EXPLORE TITAN'S PREBIOTIC CHEMISTRY AND HABITABILITY ANNOUNCEMENT OF OPPORTUNITY NNH16ZD011O

open
Feb 19, 2027Up to $116,470,000

JPL CONTRIBUTIONS TO ENVISION 42-711260

open
Jun 28, 2026Up to $125,730,000

GAMMA RAY LARGE AREA SPACE TELESCOPE (GLAST). THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPORTING NASA REVIEWS&DIRECTED ENGINEERING ANALYSIS, OBSERVATION PLANNING, MISSION SCHEDULING, SATELLITE OPERATIONS, SCIENCE DATA PROCESSING SUPPORT, SPACECRAFT HEALTH/SAFETY/PERFORMANCE ANALYSIS, INSTRUMENT PERFORMANCE SUPPORT ANALYSIS, FLIGHT/GROUND SYSTEM&SOFTWARE, AND ANOMALY RESOLUTION&ANALYSIS.

open
Mar 1, 2027Up to $131,260,000

OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE R

open
Mar 31, 2027Up to $132,450,000

THE PURPOSE OF CHARLES IS TO PROVIDE SUPPORT FOR AIRCRAFT AT JSC, BASED AT ELLINGTON FIELD IN HOUSTON, AND AT EL PASO, TEXAS

open
Sep 30, 2026Up to $143,190,000

PROVIDE THREE LANDIS FLIGHT INSTRUMENT UNITS AND RELATED SERVICES, INCLUDING THE DESIGN, ENGINEERING ANALYSES, DEVELOPMENT, FABRICATION, INTEGRATION, ALGORITHM DEVELOPMENT, TEST, EVALUATION, DELIVERY, AND SUPPORT FOR THE LANDIS

open
Mar 10, 2031Up to $138,000,000

GEOXO SOUNDER INSTRUMENT

open
Oct 31, 2050Up to $133,620,000

TAS::80 0122::TAS SPACE ENVIRONMENT IN-SITU (SEISS) INSTRUMENTS FOR WEATHER SATELLITES

open
Jun 25, 2039Up to $133,050,000

NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUC

open
May 31, 2028Up to $139,390,000

THE PURPOSE OF THIS CONTRACT IS TO ACQUIRE REPAIRS, OPERATIONS & MAINTENANCE, AND ENGINEERING (ROME) AND RELATED SERVICES FOR THE GODDARD SPACE FLIGHT CENTER (GREENBELT AND WALLOPS FLIGHT FACILITY).

open
Sep 14, 2028Up to $147,080,000

JUNO PHASE E 44-16499

open
Sep 24, 2028Up to $147,890,000

DSN OPERATION AND MAINTENANCE CDSCC

open
Sep 30, 2028Up to $147,920,000

PROGRAM SUPPORT SERVICES (CPSS) PROGRAMMATIC SUBJECT MATTER EXPERT (SME) IDIQ TASK ORDER FOR MARSHALL SPACE FLIGHT CENTER (MSFC).

open
Aug 31, 2026Up to $149,000,000

NSROC IV CONTRACTOR SHALL DESIGN, FABRICATE, INTEGRATE, & PERFORM FLIGHT QUALIFICATION TESTING OF SUB-ORBITAL PAYLOADS, PROVIDE LAUNCH VEHICLES & ASSOCIATED HARDWARE, & PROVIDE VARIOUS ACTIVITIES ASSOCIATED WITH SUBSEQUENT MISSION LAUNCH OPERATIONS

open
Sep 30, 2028Up to $147,260,000

EXOPLANET EXPLORATION ION PROGRAM (EXEP) SCIENCE&RESEARCH TECHNOLOGY (ST&T) THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGR

open
Sep 30, 2028Up to $153,280,000

INCUS (INVESTIGATION OF CONVECTIVE UPDRAFTS) (89-111155)

open
Sep 30, 2028Up to $155,470,000

OPERATIONS AND MANAGEMENT OF THE NASA BALLOON FACILITY

open
Sep 30, 2027Up to $163,490,000

SURFACE BIOLOGY & GEOLOGY (SBG): PRE-PHASE A AND PHASE A PLAN

open
Sep 28, 2026Up to $164,270,000

NASA-WIDE SPECIALIZED ENGINEERING, EVALUATION AND TEST SERVICES (NSEETS) TO PROVIDE ON/OFF-SITE PROJECT INDEPENDENT MULTIDISCIPLINARY ENGINEERING SERVICES, TESTING, CONSULTING, CONTRACTOR-ON-SITE MONITORING, AND EVALUATION OF PROJECT AND/OR PROGRAMS.

open
Sep 30, 2028Up to $166,340,000

NEW HORIZON -- PLUTO MISSION PHASE B

open
Sep 30, 2029Up to $166,880,000

IGF::CT::IGF THIS "TASK ORDER" HAS BEEN CREATED IN THE CONTRACT MANAGEMENT MODULE (CMM) SYSTEM FOR FUNDING PURPOSES ONLY AND IS NOT AN ACTUAL TASK ORDER WITH A STATEMENT OF WORK AND OTHER TASK ORDER REQUIREMENTS. THIS "TASK ORDER" HAS BEEN CREATED FOR FUNDING OBLIGATIONS ONLY AND TO ACCOUNT FOR CMM AND SAP FINANCIAL SYSTEM FUNCTIONALITY. THIS "TASK ORDER" IS TO FUND NNL13AA14C CLIN 402 (FFP IDIQ). CENTER MAINTENANCE, OPERATIONS, AND ENGINEERING (CMOE) CONTRACT. REQUIREMENT FOR THE MAINTENANCE, OPERATIONS, AND ENGINEERING OF LARC'S INSTITUTIONAL FACILITIES AND HIGHLY TECHNICAL RESEARCH FACILITIES FOR MISSION SUCCESS. THE CMOE CONTRACT WILL PROVIDE CORE SUPPORT SERVICES TO LARC IN THE AREAS OF INSTITUTIONAL AND RESEARCH OPERATIONS, MAINTENANCE, AND ENGINEERING (OME). THESE TECHNICAL SERVICES INCLUDE: RESEARCH FACILITIES OPERATIONS (E.G., HIGHLY SPECIALIZED WIND TUNNELS, LABORATORIES, TEST STANDS, INSTRUMENTATION CALIBRATION/REPAIR); CENTRAL UTILITIES OPERATIONS (E.G., STEAM, COMPRESSED A

open
Jul 31, 2026Up to $178,860,000

INTERFACE REGION IMAGING SPECTROGRAPH (IRIS). THE CONTRACTOR SHALL REFINE AND EVOLVE THE CONTRACTOR'S COST ESTIMATE FOR PHASES B-F FOR THE INTERFACE REGION IMAGING SPECTROGRAPH (IRIS) MISSION SUBMITTED IN RESPONSE TO NASA ANNOUNCEMENT OF OPPORTUNITY #NNH07ZDA003O FOR THE EXPLORERS PROJECTS DIVISION. THE PRIMARY TASKS IN PHASE B WILL INCLUDE THE GENERATION AND PRESENTATION OF THE SYSTEMS REQUIREMENTS REVIEW (SRR) AND THE PRELIMINARY DESIGN REVIEW (PDR). IN ORDER TO SUPPORT THESE REVIEWS, THE CONCEPT DEFINITION EFFORTS SHALL ENCOMPASS THE WORK REQUIRED TO UPDATE AND REFINE THE PROPOSAL'S SCIENCE INVESTIGATION OBJECTIVES AND PLANS (IF NECESSARY), INSTRUMENT AND SPACECRAFT CONCEPTS AND PERFORMANCE CHARACTERISTICS, AND SCIENCE OPERATIONS AND FLIGHT OPERATIONS PLANS AND CONCEPTS. THESE EFFORTS SHALL IDENTIFY THE CONDITIONS AND CONSTRAINTS NECESSARY FOR THE DEVELOPMENT OF AN INTEGRATED IRIS MISSION APPROACH. THE CONTRACTOR'S MISSION INTEGRATION EFFORTS SHALL INCLUDE CONSIDERATIONS FOR THE ACC

open
Sep 30, 2027Up to $191,040,000

MARS PROGRAM MANAGEMENT AND FUTURE PLANNING 60-8583

open
Sep 30, 2028Up to $190,700,000

ENERGIA WILL PROVIDE HARDWARE AND SERVICES THAT SUPPORT INTERNATIONAL SPACE STATION

open
Dec 31, 2028Up to $192,510,000

NASA CONSOLIDATED APPLICATION AND PLATFORM SERVICES (NCAPS)

open
Jun 30, 2026Up to $190,900,000

THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS) IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS

open
Apr 30, 2026Up to $181,430,000

IGF::OT::IGF LAUNCH VEHICLE/STAGES ADAPTER

open
Sep 30, 2027Up to $205,530,000

MARS RECONNAISSANCE ORBITER: PHASE E 62-10131

open
Sep 30, 2028Up to $205,870,000

TIME HISTORY OF EVENTS&MACROSCALE INTERACTIONS DURING SUBSTORMS (THEMIS) MISSION PHASE A EFFORT THE CONTRACTOR SHALL PROVIDE A CONCEPT STUDY FOR THE THEMIS MISSION IN ORDER TO PROVIDE NASA WITH MORE DEFINITIVE INFORMATION REGARDING THE COST, RISK, AND FEASIBILITY OF THE INVESTIGATION. THE CONTRACTOR SHALL PREPARE AND DELIVER A CONCEPT STUDY REPORT DETAILING THE RESULTS OF THE STUDY IN ACCORDANCE WITH ATTACHMENT B OF THE CONTRACT ENTITLED "MEDIUM-CLASS EXPLORER PROGRAM GUIDELINES AND CRITERIA FOR THE PHASE A CONCEPT STUDY". THE CONTRACTOR SHALL ALSO SUPPORT A NASA SITE VISIT AT ITS FACILITY TO DISCUSS THE CONCEPT STUDY REPORT AND ATTEND A PHASE A CONCEPT STUDY REVIEW MEETING, BRIDGE PHASE OPTION: THE CONTRACTOR SHALL COMMENCE INITIAL DEFINITION PHASE ACTIVITIES, INCLUDING LONG LEAD PARTS PROCUREMENTS. AND THE FOLLOWING ACTIVITIES: - PROVIDE PROGRAM MANAGEMENT FOR THEMIS; - BEGIN SCIENTIFIC STUDIES AND SIMULATIONS TO PROVIDE SCIENTIFIC INPUT FOR INSTRUMENT AND ORBIT DESIGN ENSURING THEY

open
Sep 30, 2028Up to $199,540,000

FLIGHT DYNAMICS SUPPORT SERVICES III (FDSS). THIS CONTRACT IS FOR, BUT NOT LIMITED TO SOFTWARE ENGINEERING SUPPORT, FLIGHT DYNAMICS FACILITY OPERATIONS SUPPORT, FLIGHT DYNAMICS SYSTEMS ENGINEERING SUPPORT&CONJUNCTION ASSESSMENTS.

open
Apr 30, 2027Up to $199,410,000

THE REQUIREMENT IS TO ASSIST NASA IN ACCELERATING THE INTRODUCTION OF MEGAWATT CLASS EAP SYSTEMS INTO FUTURE AIRCRAFT PRODUCTS BY U.S. INDUSTRY. THIS EFFORT HELPS TO IDENTIFY CERTIFICATION GAPS, AND ADDRESS GAPS THROUGH GROUND TEST AND FLIGHT TESTS.

open
Sep 29, 2026Up to $211,060,000

MARSHALL ENGINEERING TECHNICIANS AND TRADES SUPPORT (METTS III) COVERS A WIDE RANGE OF ENGINEERING TECHNICIANS AND TRADE SKILLS TO PERFORM TESTING GROUND AND SPACE BASED RESEARCH TEST OPERATIONS DATA ANALYSIS INSTRUMENTATION CALIBRATION

open
Dec 31, 2026Up to $214,590,000

SPACE AND EARTH SCIENCES DATA ANALYSIS (SESDA V)

open
Mar 31, 2028Up to $227,460,000

MULTI-SLIT SOLAR EXPLORER (MUSE) MISSION PHASE A

open
Jul 1, 2027Up to $214,760,000

IGF::OT::IGF NASA, THROUGH THE SPACE TECHNOLOGY MISSION DIRECTORATE (STMD,) SEEKS TO DEMONSTRATE AN ADVANCED SOLAR ELECTRIC PROPULSION (EP) SYSTEM THAT WILL ENABLE FUTURE DEEP SPACE HUMAN AND ROBOTIC EXPLORATION APPLICABLE TO THE UNITED STATES PRIVATE AND PUBLIC SECTOR SPACE NEEDS. THE PURPOSE OF THE ADVANCED ELECTRIC PROPULSION (EP) SYSTEM (AEPS) CONTRACT IS THE DEVELOPMENT AND DELIVERY OF EP STRING SETS TO SUPPORT AN ADVANCED SEP DEMONSTRATION MISSION. DURING THE CONTRACT BASE PERIOD OF PERFORMANCE, THE CONTRACTOR WILL DEVELOP, TEST, AND DELIVER ENGINEERING DEVELOPMENT END ITEMS THAT WILL REDUCE THE RISK OF DEVELOPING THE FLIGHT END ITEMS. DURING THE OPTION PERIOD OF PERFORMANCE, IF EXERCISED, THE CONTRACTOR WILL DEVELOP, VERIFY, AND DELIVER THE FLIGHT END ITEMS.

open
Aug 4, 2027Up to $230,230,000

ADVANCED MULTI-MISSION OPERATING SYSTEM (AMMOS) (93-107877)

open
Sep 27, 2026Up to $223,190,000

THE OVERALL SCOPE OF THIS CONTRACT IS TO PROVIDE WALLOPS RANGE OPERATIONS AND MAINTENANCE SUPPORT SERVICES TRAINING COMMAND, CONTROL, COMMUNICATIONS, INFORMATION AND COMPUTER SYSTEMS SERVICES TESTING, MODIFYING AND INSTALLING COMMUNICATIONS AND ELECTRONIC SYSTEMS AT LAUNCH FACILITIES, LAUNCH CONTROL CENTERS AND TEST FACILITIES RANGE SUSTAINING ENGINEERING SERVICES, AND GROUND OPERATIONS SUPPORT. THIS EFFORT PROVIDES DIRECT CUSTOMER SUPPORT TO NASA WFF'S RANGE BY PROVIDING QUALIFIED PERSONNEL, EQUIPMENT, TOOLS, MATERIALS, VEHICLES, SPECIALIZED TEST EQUIPMENT, SUPERVISION, AND OTHER SERVICES. NASA'S WFF REQUIRES AN INNOVATIVE, INTEGRATED, FLEXIBLE AND EFFECTIVE MANAGEMENT APPROACH AND THE CONTRACTOR MUST PROVIDE TECHNICAL SUPPORT IN A PLANNED AND COORDINATED MANNER WHICH WILL ENSURE ESSENTIAL WALLOPS RANGE SUPPORT SYSTEMS ARE READY TO SUPPORT USER REQUIREMENTS, AND CAUSE NO IMPACT TO WALLOPS RANGE PROGRAM SCHEDULES DUE TO EQUIPMENT DEGRADATION, FAILURES, SYSTEM PROBLEMS OR REPRIORITIZATI

open
Jun 30, 2026Up to $232,850,000

IGF::CT::IGF THIS "TASK ORDER" HAS BEEN CREATED IN THE CONTRACT MANAGEMENT MODULE (CMM) SYSTEM FOR FUNDING PURPOSES ONLY AND IS NOT AN ACTUAL TASK ORDER WITH A STATEMENT OF WORK AND OTHER TASK ORDER REQUIREMENTS. THIS "TASK ORDER" HAS BEEN CREATED FOR FUNDING OBLIGATIONS ONLY AND TO ACCOUNT FOR CMM AND SAP FINANCIAL SYSTEM FUNCTIONALITY. THIS "TASK ORDER" IS TO FUND NNL13AA14C CLIN 2 (OPERATIONS). CENTER MAINTENANCE, OPERATIONS, AND ENGINEERING (CMOE) CONTRACT. REQUIREMENT FOR THE MAINTENANCE, OPERATIONS, AND ENGINEERING OF LARC'S INSTITUTIONAL FACILITIES AND HIGHLY TECHNICAL RESEARCH FACILITIES FOR MISSION SUCCESS. THE CMOE CONTRACT WILL PROVIDE CORE SUPPORT SERVICES TO LARC IN THE AREAS OF INSTITUTIONAL AND RESEARCH OPERATIONS, MAINTENANCE, AND ENGINEERING (OME). THESE TECHNICAL SERVICES INCLUDE: RESEARCH FACILITIES OPERATIONS (E.G., HIGHLY SPECIALIZED WIND TUNNELS, LABORATORIES, TEST STANDS, INSTRUMENTATION CALIBRATION/REPAIR); CENTRAL UTILITIES OPERATIONS (E.G., STEAM, COMPRESSED A

open
Jul 31, 2026Up to $251,980,000

THE PRINCIPAL PURPOSE OF THIS FOLLOW-ON CONTRACT IS TO PROVIDE MULTIDISCIPLINE ENGINEERING SUPPORT SERVICES.

open
Nov 30, 2028Up to $254,750,000

EARTH OBSERVING SYSTEM DATA AND INFORMATION SYSTEM (EOSDIS) EVOLUTION AND DEVELOPMENT (EED)-3 EOSDIS EED-3 SERVICES

open
Jul 31, 2026Up to $252,770,000

MARSHALL OPERATIONS SYSTEMS, SERVICES, AND INTEGRATION II (MOSSI II)

open
Dec 31, 2026Up to $243,130,000

UNDER THIS SES III CONTRACT, THE SOFTWARE ENGINEERING DIVISION (SED) OF THE ENGINEERING AND TECHNOLOGY DIRECTORATE (ETD) PROVIDES QUALITY SOFTWARE PRODUCTS, SERVICES AND EXPERTISE TO ENSURE THE SUCCESS OF NASA MISSIONS AND STAKEHOLDERS.

open
Aug 31, 2027Up to $244,700,000

EXPLORATION UPPER STAGE ENGINES MSFC WILL PROCURE TEN (10) RL10 FLIGHT ENGINES FROM AEROJET ROCKETDYNE, INC. TO SUPPORT THE SPACE LAUNCH SYSTEM (SLS) EXPLORATION MISSIONS 2 AND 3 (EM-2 AND EM-3). EACH FLIGHT WILL REQUIRE A FOUR (4) ENGINE CLUSTER. ADDITIONALLY, TWO (2) SPARE ENGINES WILL BE PROCURED. CORRESPONDING TO THESE SPECIFIC RL10 ENGINES, NASA MSFC WILL PROCURE VEHICLE AND PROGRAM INTEGRATION SUPPORT, FLIGHT SUPPORT, AND HUMAN RATING COMPLIANCE REVIEW SUPPORT.

open
Dec 31, 2028Up to $285,090,000

MARS SCIENCE LABORATORY 67-8636

open
Sep 30, 2028Up to $306,770,000

EXPLORATION EXTRAVEHICULAR ACTIVITY SERVICE (XEVAS) ARTEMIS PROGRAM

open
Jun 2, 2028Up to $312,940,000

IGF::CT::IGF THIS "TASK ORDER" HAS BEEN CREATED IN THE CONTRACT MANAGEMENT MODULE (CMM) SYSTEM FOR FUNDING PURPOSES ONLY AND IS NOT AN ACTUAL TASK ORDER WITH A STATEMENT OF WORK AND OTHER TASK ORDER REQUIREMENTS. THIS "TASK ORDER" HAS BEEN CREATED FOR FUNDING OBLIGATIONS ONLY AND TO ACCOUNT FOR CMM AND SAP FINANCIAL SYSTEM FUNCTIONALITY. THIS "TASK ORDER" IS TO FUND NNL13AA14C CLIN 1 (MAINTENANCE). CENTER MAINTENANCE, OPERATIONS, AND ENGINEERING (CMOE) CONTRACT. REQUIREMENT FOR THE MAINTENANCE, OPERATIONS, AND ENGINEERING OF LARC'S INSTITUTIONAL FACILITIES AND HIGHLY TECHNICAL RESEARCH FACILITIES FOR MISSION SUCCESS. THE CMOE CONTRACT WILL PROVIDE CORE SUPPORT SERVICES TO LARC IN THE AREAS OF INSTITUTIONAL AND RESEARCH OPERATIONS, MAINTENANCE, AND ENGINEERING (OME). THESE TECHNICAL SERVICES INCLUDE: RESEARCH FACILITIES OPERATIONS (E.G., HIGHLY SPECIALIZED WIND TUNNELS, LABORATORIES, TEST STANDS, INSTRUMENTATION CALIBRATION/REPAIR) CENTRAL UTILITIES OPERATIONS (E.G., STEAM, COMPRESSED A

open
Jul 31, 2026Up to $263,060,000

SURFACE WATER AND OCEAN TOPOGRAPHY (SWOT) 83-16443

open
Sep 30, 2026Up to $295,610,000

SPHEREX:AN ALL-SKY SPECTRAL SURVEY 71-700089

open
Apr 30, 2028Up to $267,710,000

TAS::80 0114::TAS SOLAR ULTRAVIOLET IMAGER (SUVI) INSTRUMENT. THIS CONTRACT IS FOR THE DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, EVALUATE AND SUPPORT LAUNCH OF THE SOLAR ULTRAVIOLET IMAGER (SUVI) INSTRUMENT, SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT THE SATELLITE OPERATIONS CONTROL CENTER (SOCC). THE SUVI IS CLASSIFIED AS A NON-PRIMARY INSTRUMENT ON THE GOES-R SATELLITE AND HAS A RISK CLASSIFICATION OF B. THE SUVI INSTRUMENT PROVIDES A BROADBAND IMAGING IN THE EXTREME ULTRAVIOLET WAVELENGTH RANGE TO MONITOR THE ENTIRE DYNAMIC RANGE OF SOLAR FEATURES, FROM CORONAL HOLES TO FLARES, AS WELL AS THE ESTIMATE OF TEMPERATURE AND EMISSION MEASURE. THESE DATA ARE USED FOR GEOMAGNETIC STORM FORECASTS AND FORECASTS OF SOLAR ENERGETIC PARTICLE EVENTS RELATED TO FLARES. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR 4 FL

open
Apr 30, 2039Up to $325,880,000

GEOXO IMAGER (GXI) INSTRUMENT IMPLEMENTATION

open
Jun 30, 2050Up to $340,960,000

THIS DELIVERY ORDER IS ISSUED PURSUANT TO THE SCHEDULE OF SUPPLIES, CONTRACT PERIOD PRICING, OTHER PRICING OPTIONS, AND TERMS AND CONDITIONS OF CONTRACT 80KSC023DA010 FOR HELIUM AT KENNEDY SPACE CENTER.

open
Oct 31, 2026Up to $346,980,000

DESIGN BUILD AND DELIVER 3 GEOXO SPACECRAFT

open
Jun 30, 2048Up to $363,370,000

THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.

open
Apr 16, 2033Up to $347,820,000

THE ETIS III CONTRACT WILL PROVIDE ENVIRONMENTAL TEST AND INTEGRATION RELATED SERVICES FOR NASA GSFC ENGINEERING AND TECHNOLOGY DIRECTORATE (ETD) MECHANICAL SYSTEMS DIVISION AND RELATED ORGANIZATIONS FOR THE FORMULATION, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACEFLIGHT AND GROUND SYSTEM HARDWARE AND SOFTWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.

open
Apr 30, 2026Up to $337,190,000

THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCE

open
Jun 30, 2026Up to $360,200,000

VOLATILES INVESTIGATING POLAR EXPLORATION ROVER (VIPER) DELIVERY

open
Oct 31, 2026Up to $314,010,000

TAS::80 0120::TAS AS THE PRINCIPAL INVESTIGATOR (PI) INSTITUTION FOR THE MAGNETOSPHERIC MULTISCALE (MMS) INSTRUMENT SUITE SCIENCE TEAM (ISST), THE CONTRACTOR IS RESPONSIBLE FOR LEADING THE SOLVING MAGNETOSPHERIC ACCELERATION RECONNECTION AND TURBULENCE (SMART) TEAM THROUGH ALL MISSION PHASES. THE SCOPE OF WORK SHALL INCLUDE, BUT NOT BE LIMITED, TO THE FOLLOWING: - MANAGE THE SMART TEAM THROUGH PHASES B THROUGH E OF THE MMS MISSION, - DEFINING SCIENCE GOALS AND OBJECTIVES - ASSIST THE MMS PROJECT AND HQ SCIENCE MISSION DIRECTORATE HELIOPHYSICS DIVISION IN THE PREPARATION OF LEVEL 1 REQUIREMENTS FOR THE MMS MISSION - FLOW-DOWN OF TOP-LEVEL MISSION REQUIREMENTS TO THE APPROPRIATE ELEMENTS OF THE INSTRUMENT SUITE - DESIGN, FABRICATION, INTEGRATION, CALIBRATION, TESTING AND DELIVERY OF FOUR FULLY QUALIFIED, FLIGHT INSTRUMENT SUITES TO OBSERVATORY INTEGRATION AND TEST (I&T) PLUS SPARES - DESIGN, DEVELOPMENT, INTEGRATION AND TESTING OF THE SOC - SUPPORT OBSERVATORY-LEVEL I&T ACTIVITIES - PROV

open
Sep 30, 2026Up to $383,430,000

INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) PHASE CD

open
Jan 31, 2028Up to $400,020,000

WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) CORONAGRAPH THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RES

open
Jan 31, 2027Up to $391,510,000

OPERATION AND MAINTENANCE OF THE MADRID DEEP SPACE COMMUNICATIONS COMPLEX.

open
May 16, 2026Up to $412,390,000

ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES CULMINATING IN AN OSIRIS-REX PROJECT MISSION DESIGN REVIEW (MDR). THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE OSIRIS-REX PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM.

open
Mar 31, 2027Up to $437,350,000

OPTICAL TELESCOPE ASSEMBLY (OTA) THIS CONTRACT PROVIDES FOR ALL EFFORTS AND RESPONSIBILITIES FOR THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO BUILD, REFURBISH, OR MODIFY THE OTA AS REQUIRED TO MEET THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) PERFORMANCE REQUIREMENTS.

open
Jan 31, 2027Up to $372,590,000

DESIGN, DEVELOP, MANUFACTURE, TEST, INTEGRATE, ACHIEVE NASA ACCEPTANCE, DELIVER, AND SUSTAIN ITS UNITED STATES DEORBIT VEHICLE (USDV) SUCH THAT THE USDV CAN PERFORM THE FINAL DEORBIT OF THE INTERNATIONAL SPACE STATION (ISS)

open
Mar 31, 2031Up to $425,570,000

THE MIST II CONTRACT WILL PROVIDE MULTIDISCIPLINARY ENGINEERING TASK ORDERS FOR THE FORMULATION, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT AND GROUND SYSTEM HARDWARE AND SOFTWARE.

open
Sep 13, 2027Up to $393,480,000

THE PURPOSE OF THIS CONTRACT IS TO ACQUIRE SCIENTIFIC RESEARCH SERVICES THAT CONCEIVES, DEVELOPS AND APPLIES SPACE, FIELD-DEPLOYED (I.E. AIRBORNE AND IN SITU) AND LABORATORY BASED TECHNOLOGIES AND OBSERVATIONS OF THE EARTH SYSTEMS.

open
Sep 30, 2026Up to $436,270,000

GROUND SYSTEMS AND MISSION OPERATIONS (GSMO-3)

open
May 31, 2027Up to $573,500,000

TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS

open
Jun 25, 2039Up to $486,220,000

ENGINEERING SERVICES AND DEVELOPMENT LEADING TO THE DELIVERY OF THE OMPS PROTOFLIGHT MODEL AND SUPPORT.

open
Nov 10, 2029Up to $478,990,000

NASA ISRO SYNTHETIC APERTURE RADAR (NISAR) MISSION 89-17620

open
Sep 30, 2028Up to $756,780,000

THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, FACILITIES, EQUIPMENT, MATERIAL, AND SERVICES NECESSARY TO DESIGN, DEVELOP, MANUFACTURE, INTEGRATE, TEST, AND DELIVER THE HARDWARE, DOCUMENTATION, AND SERVICES SPECIFIED HEREIN. THE CONTRACTOR SHALL ALSO PROVIDE SUPPORT, AS REQUIRED, FOR PRE-DELIVERY MISSION INTEGRATION ACTIVITIES, SUCH AS NPP MISSION OPERATIONS REVIEW AND JPSS DELTA-PDR. DOCUMENTATION AND OTHER TASKS SHOULD BE IN ACCORDANCE WITH THE REQUIREMENTS OF THIS SOW AND THE APPLICABLE DOCUMENTATION REFERENCED IN SECTION 2.3 HEREIN. COMPLIANCE WITH THE REQUIREMENTS STATED HEREIN, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

open
Mar 1, 2029Up to $584,350,000

NEAR EARTH OBJECT SURVEYOR (NEO SURVEYOR) PROJECT (71-107722)

open
Oct 31, 2027Up to $855,850,000

ENGINEERING SERVICES AND DEVELOPMENT LEADING TO THE DELIVERY OF THE VISIBLE INFRARED IMAGER RADIOMETER (VIRS) INSTRUMENT AND SUPPORT.

open
Mar 1, 2029Up to $1,220,000,000

ENGINEERING SERVICES AND DEVELOPMENT LEADING TO THE DELIVERY OF THE CROSS TRACK INFRARED SOUNDER (CRIS) INSTRUMENT AND SUPPORT.

open
Nov 10, 2029Up to $814,440,000

TAS::80 0122::TAS DEVELOPMENT, MANUFACTURING AND SUPPORT TO WEATHER OBSERVING INSTRUMENT

open
Jun 25, 2039Up to $1,040,000,000

PSYCHE: JOURNEY TO A METAL WORLD THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNM

open
Sep 30, 2028Up to $807,810,000

DRAGONFLY EXTENDED PHASE B MISSION UNDER 80MSFC20D0004 AEROSPACE RESEARCH, DEVELOPMENT AND ENGINEERING SUPPORT (ARDES) II.

open
Aug 31, 2028Up to $1,270,000,000

DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).

open
Jun 5, 2026Up to $1,550,000,000

M2020 MARS SCIENCE ROVER PROJECT-PHASE A-D 60-19107 THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND A

open
Sep 24, 2028Up to $1,280,000,000

THE EXPLORATION AND SPACE COMMUNICATIONS PROJECTS DIVISION (ESC) IS A NATIONAL RESOURCE LOCATED AT GODDARD SPACE FLIGHT CENTER (GSFC) WHICH ENABLES SCIENTIFIC DISCOVERY AND SPACE EXPLORATION BY PROVIDING INNOVATIVE AND MISSION-EFFECTIVE SPACE COMMUNICATIONS AND NAVIGATION SOLUTIONS TO A LARGE COMMUNITY OF DIVERSE CUSTOMERS. ESC MANAGES OPERATIONAL GEOSTATIONARY COMMUNICATIONS RELAY SATELLITES AND GROUND SYSTEMS FOR THE SPACE COMMUNICATIONS AND NAVIGATION (SCAN) PROGRAM AT NASA HEADQUARTERS. TODAY, SCAN NETWORK SYSTEMS CONSIST OF THE SPACE NETWORK (SN), THE NEAR EARTH NETWORK (NEN), AND THE DEEP SPACE NETWORK (DSN). THE DAY-TO-DAY MANAGEMENT OF THESE THREE NETWORKS IS CURRENTLY NOT FULLY CONSISTENT. IT IS THE INTENTION OF THE GOVERNMENT TO UNIFY THE SN AND NEN WHERE PRACTICABLE UNDER THIS CONTRACT USING INTEGRATED, COMMON MANAGEMENT PRACTICES AND NETWORK SOLUTIONS.

open
Sep 30, 2027Up to $1,510,000,000

FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS

open
Jun 30, 2026Up to $4,420,000,000

IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.

open
Sep 30, 2029Up to $3,180,000,000

IGF::OT::IGF THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. NASA CERTIFICATION UNDER CLIN 001 IS COMPLETE WHEN THE CONTRACTOR'S CREW TRANSPORTATION SYSTEM (CTS) HAS MET NASA'S R

open
Dec 31, 2030Up to $3,030,000,000

SPACE LAUNCH SYSTEM (SLS) STAGES PRODUCTION AND EVOLUTION CONTRACT (SPEC)

open
Jul 1, 2028Up to $2,380,000,000

MARS SAMPLE RETURN (MSR) PROGRAM - PHASE A 40-108270

open
Sep 24, 2028Up to $1,590,000,000

WORK REQUIRED FOR THE DESIGN, DEVELOPMENT, MANUFACTURE, TEST, LAUNCH, DEMONSTRATION, AND ENGINEERING SUPPORT OF THE HUMAN LANDING SYSTEM (HLS) INTEGRATED LANDER.

open
Dec 6, 2027Up to $3,020,000,000

FOLLOW ON CONTRACT TO PROVIDE OPERATIONS AND SCIENCE SUPPORT TO THE CXO

open
Sep 30, 2027Up to $1,350,000,000

DEEP SPACE NETWORK (DSN) THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2)

open
Sep 30, 2028Up to $1,440,000,000

THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT SPAN THE MAJOR PHASES OF THE MISSION BEGINNING WITH FORMULATION THROUGH DEVELOPMENT AND TESTING, AND ENDING ONE YEAR AFTER LAUNCH WITH THE INITIATION OF THE JAMES WEBB SPACE TELESCOPE (JWST) SCIENCE PROGRAM. THESE MAJOR ACTIVITIES ARE SEPARATED INTO THE BASELINE PROGRAM AND SPECIAL STUDIES. THE BASELINE PROGRAM INCLUDES: A. MISSION REQUIREMENTS ANALYSIS AND OBSERVATORY/MISSION DESIGN SUPPORT INCLUDING: TRADESTUDY GENERATION, SCIENCE AND OPERATIONS IMPACT ANALYSIS, SCIENCE SYSTEMS ENGINEERING SUPPORT, AND DESIGN REFERENCE MISSION ANALYSIS. B. GROUND SEGMENT DEVELOPMENT, TESTING, MAINTENANCE AND OPERATIONS INCLUDING: OPERATIONS SUPPORT OF SI, FGS, ISIM, AND OBSERVATORY INTEGRATION AND TEST (I&T), MISSION SIMULATIONS, AND DOCUMENTATION MAINTENANCE, AS WELL AS LOW COST OPERATIONS CONCEPTS. C. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, PROPOSAL MANAGEMENT AND USER GRANT ADMINISTRATION,

open
Jun 25, 2027Up to $1,500,000,000

IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE

open
May 31, 2029Up to $1,550,000,000

RAPID DDT&E AND DEMONSTRATION OF S SUSTAINABLE HUMAN LANDING SYSTEM INTEGRATED LANDER.

open
Jan 29, 2029Up to $1,710,000,000

THE GOVERNMENT IS PROCURING THE NEXT-GENERATION GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) SERIES TO CONTINUE ITS MISSION THROUGH NEW REQUIREMENTS SPECIFIED IN THE GOES-R LEVEL I REQUIREMENTS DOCUMENT AND MISSION REQUIREMENTS DOCUMENT (MRD). THE FIRST SATELLITE OF THIS NEW SERIES, DESIGNATED AS GOES-R, WILL PROVIDE THE FIRST MAJOR IMPROVEMENT IN INSTRUMENT TECHNOLOGY SINCE GOES-I LAUNCHED IN 1994. THE GOES-R SERIES WILL INTRODUCE OTHER NEW TECHNOLOGIES IN BOTH THE SPACE AND GROUND SEGMENTS. THESE ADVANCES WILL IMPROVE THE NATION'S ABILITY TO MONITOR AND FORECAST WEATHER AND ENVIRONMENTAL PHENOMENA WITH A SIGNIFICANT INCREASE IN THE NUMBER OF PRODUCTS. ONE OF NOAA'S PRINCIPAL MISSIONS IS TO PROVIDE FORECASTS AND WARNINGS FOR THE UNITED STATES, ITS TERRITORIES, ADJACENT WATERS AND OCEAN AREA FOR THE PROTECTION OF LIFE AND PROPERTY AND ENHANCEMENT OF THE NATIONAL ECONOMY. THIS MISSION REQUIRES THE CAPABILITY TO ACQUIRE, PROCESS, AND DISSEMINATE ENVIRONMENTAL DATA ON AN EXTE

open
Apr 30, 2039Up to $2,030,000,000

EXTRAVEHICULAR SPACE OPERATIONS CONTRACT (ESOC)

open
Sep 30, 2027Up to $1,410,000,000

THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT INCLUDE THE FINAL SERVICING MISSION AND SUBSEQUENT OPERATIONS THROUGH END-OF-MISSION. THESE ACTIVITIES INCLUDE: A. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, MANAGEMENT OF THE PROPOSAL SELECTION, TIME ALLOCATION, AND GRANT AWARD COMMITTEE PROCESSES, AND SCIENCE COMMUNITY OUTREACH. B. ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION AND RECEIPT, OBSERVATION PLANNING AND SCHEDULING, UPDATING INSTRUMENT HANDBOOKS, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, ANOMALY INVESTIGATION SUPPORT, USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE AND ENGINEERING OPERATIONS SUPPORT. C. GROUND SYSTEM SUSTAINING ENGINEERING INCLUDING: SCIENCE OPERATION SYSTEM MAINTENANCE, INFRASTRUCTURE ADMINISTRATION AND SUPPORT, AND DOCUMENTATION MAINTENANCE D. SERVICING MISSION SUPPORT INCLUDING: PR

open
Jun 30, 2026Up to $2,510,000,000

ENGINEERING SERVICES AND SCIENCE CAPABILITY AUGMENTATION (ESSCA)

open
Nov 30, 2026Up to $1,890,000,000

INTERIM CRYOGENIC PROPULSION STAGE FOR SLS

open
Dec 31, 2027Up to $1,260,000,000

ELECTRICITY SERVICES

open
Aug 21, 2028Up to $75,240,000

SMAP (SOIL MOISTURE ACTIVE/PASSIVE) MISSION 88-12659

open
Sep 27, 2026Up to $77,110,000

GLOBAL LYMAN-ALPHA IMAGERS OF THE DYNAMIC EXOSPHERE (GLIDE) INSTRUMENT PROGRAM DEVELOPMENT (PHASE B) SUPPORT.

open
May 5, 2026Up to $77,490,000

SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM

open
Aug 31, 2027Up to $81,170,000

DSN APERTURE ENHANCEMENT PROJECT (DAEP) THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND

open
Jun 30, 2027Up to $80,100,000

SCIENCE MISSION DIRECTORATE, RESEARCH AND ANALYSIS FOR SPACE SCIENCE, OUTER SOLAR SYSTEM AND ASTEROID SCIENCE

open
Sep 30, 2027Up to $82,090,000

GRAVITY RECOVERY AND CLIMATE EXPERIMENT-FOLLOW ON (GRACE-FO) MISSION: PHASE A 83-17494

open
Sep 30, 2028Up to $81,140,000

CARGO MISSION CONTRACT 4 (CMC4)

open
Sep 30, 2026Up to $79,580,000

COOPERATIVE AUTONOMOUS DISTRIBUTED ROBOTIC EXPLORERS TECH DEMONSTRATION (CADRE) 15-107746

open
Sep 27, 2026Up to $81,830,000

NATIONAL CENTER FOR CRITICAL INFORMATION PROCESSING AND STORAGE (NCCIPS)

open
Sep 30, 2026Up to $87,570,000

ORBITING CARBON OBSERVATORY-2 (OCO-2) TAILORED FORMULATION 85-15362

open
Sep 30, 2028Up to $82,400,000

STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.

open
Apr 8, 2030Up to $82,350,000

PHYSICAL OCEANOGRAPHY DISTRIBUTED ACTIVE ARCHIVE CENTER-2 (PO.DAAC-2) THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND

open
Sep 30, 2026Up to $85,350,000

MARS ODYSSEY: PHASE E 68-6480

open
Sep 30, 2028Up to $89,710,000

VERITAS (VENUS EMISSIVITY, RADIO SCIENCE, INSAR, TOPOGRAPHY, AND SPECTROSCOPY) (41-108259)

open
Sep 27, 2026Up to $88,740,000

THIS DELIVERY ORDER IS FOR PROVIDING AN ENTERPRISE-WIDE SOLUTION FOR CLOUD SERVICES

open
Jan 31, 2029Up to $92,710,000

LOGISTICS SERVICES

open
Feb 28, 2027Up to $90,220,000

SENTINEL-6 MISSION-PHASE C/D THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS

open
Apr 30, 2026Up to $91,750,000

IGF::CT::IGF THIS "TASK ORDER" HAS BEEN CREATED IN THE CONTRACT MANAGEMENT MODULE (CMM) SYSTEM FOR FUNDING PURPOSES ONLY AND IS NOT AN ACTUAL TASK ORDER WITH A STATEMENT OF WORK AND OTHER TASK ORDER REQUIREMENTS. THIS "TASK ORDER" HAS BEEN CREATED FOR FUNDING OBLIGATIONS ONLY AND TO ACCOUNT FOR CMM AND SAP FINANCIAL SYSTEM FUNCTIONALITY. THIS "TASK ORDER" IS TO FUND NNL13AA14C CLIN 403 (CPFF IDIQ). CENTER MAINTENANCE, OPERATIONS, AND ENGINEERING (CMOE) CONTRACT. REQUIREMENT FOR THE MAINTENANCE, OPERATIONS, AND ENGINEERING OF LARC'S INSTITUTIONAL FACILITIES AND HIGHLY TECHNICAL RESEARCH FACILITIES FOR MISSION SUCCESS. THE CMOE CONTRACT WILL PROVIDE CORE SUPPORT SERVICES TO LARC IN THE AREAS OF INSTITUTIONAL AND RESEARCH OPERATIONS, MAINTENANCE, AND ENGINEERING (OME). THESE TECHNICAL SERVICES INCLUDE: RESEARCH FACILITIES OPERATIONS (E.G., HIGHLY SPECIALIZED WIND TUNNELS, LABORATORIES, TEST STANDS, INSTRUMENTATION CALIBRATION/REPAIR); CENTRAL UTILITIES OPERATIONS (E.G., STEAM, COMPRESSED

open
Jul 31, 2026Up to $92,650,000

PROVIDE AIRCRAFT AND GROUND CONTROL STATION (GCS) SPARE PARTS AND PROVIDE ENGINEERING, MAINTENANCE TECHNICIAN, LOGISTICS TECHNICIAN AND PILOT SUPPORT.

open
Oct 29, 2026Up to $93,220,000

PROGRAM MANAGEMENT OF THE NASA POSTDOCTORAL PROGRAM 2

open
Jan 29, 2027Up to $93,650,000

CRISTAL PROJECT - FORMULATION PHASE A/B (89-210198)

open
Sep 30, 2028Up to $95,710,000

JPL RADIOISOTOPE NUCLEAR SYSTEMS AND TECHNOLOGY PROGRAM SUPPORT TO NASA RADIOISOTOPE POWER SYSTEMS (RPS) PROGRAM 43-12921

open
Jul 30, 2028Up to $97,410,000

THIS EFFORT IS FOR WORK PERFORMED DURING PHASE B THROUGH F OF THE TRANSITING EXOPLANET SURVEY SATELLITE (TESS) MISSION. THE SPECIFIC REQUIREMENTS FOR EACH OF THESE PHASES ARE PRESENTED IN INDIVIDUAL SECTIONS BELOW. THE EFFORT ALSO INCLUDES TASKS TO: DESIGN, ANALYZE, VALIDATE, DEVELOP, FABRICATE, ASSEMBLE, INTEGRATE, TEST, AND DELIVER THE TESS SPACECRAFT; INTEGRATE, TEST, AND OPERATE THE TESS OBSERVATORY; AND DEVELOP, TEST, OPERATE, AND SUSTAIN THE ASSOCIATED MISSION OPERATIONS CENTER (MOC). THE CONTRACTOR IS RESPONSIBLE FOR THE DEVELOPMENT OF THE SPACECRAFT AND CAMERA ACCOMMODATION STRUCTURE, INCLUDING THE SUNSHADE. THE TESS INSTRUMENT, CONSISTING OF THE CAMERA STRUCTURE ASSEMBLY, DATA HANDLING UNIT AND HARNESS, WILL BE PROVIDED AS GOVERNMENT FURNISHED EQUIPMENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INTEGRATION ACTIVITIES BETWEEN THE INSTRUMENT AND THE SPACECRAFT WITH INSTRUMENT PERSONNEL SUPPORT. THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, MATERIALS, FACILITIES AND RESOURCES NECESS

open
Jun 18, 2026Up to $101,980,000

SCIENCE MISSION DIRECTORATE, RESEARCH AND ANALYSIS (R&A), FOR ASTROPHYSICS ROSES AWARDS AND GUEST OBSERVER AWARD SUPPORT

open
Sep 24, 2028Up to $102,420,000

SCIENCE MISSION DIRECTORATE (SMD) SOLICITATION PEER REVIEW PROGRAM PORTFOLIO SUPPORT

open
Jul 31, 2026Up to $102,710,000

TAS::80 0120::TAS THIS CONTRACT IS FOR THE TASKS NECESSARY TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, EVALUATE AND SUPPORT LAUNCH OF THE EUVS XRS IRRADIANCE SENSORS (EXIS), SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT THE SATELLITE OPERATIONS CONTROL CENTER (SOCC). THE EXIS IS CLASSIFIED AS A NON-PRIMARY INSTRUMENT SUITE ON THE GOES-R SATELLITE AND HAS A RISK CLASSIFICATION OF B. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR 4 FLIGHT MODELS B) ONE EXIS FLIGHT MODEL (FM) C) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) D) TWO EXIS EMULATORS (EXISES) E) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) F) ONE GROUND PROCESSING DEVELOPMENT SYSTEM (GPDS) G) SPARES FOR THE FOUR FMS H) ALL ADDITIONAL EXIS MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS

open
Jun 25, 2039Up to $105,230,000

SYSTEMS AND SOFTWARE ASSURANCE SERVICES 2 (SAS2) THE PRINCIPLE PURPOSE OF THIS CONTRACT IS TO ACQUIRE SYSTEMS AND SOFTWARE ASSURANCE SERVICES, INCLUDING IV&V AND SAFETY AND MISSION ASSURANCE ANALYSIS ON SELECTED SYSTEMS AND SOFTWARE BEING DEVELOPED

open
Sep 30, 2027Up to $106,480,000

TAS::80 0114::TAS THE ATOMOSPHERIC IMAGE ASSEMBLY

open
Sep 30, 2027Up to $141,100,000

THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE).

open
Jan 31, 2027Up to $307,900,000

SPACE WEATHER NEXT LAGRANGE SERIES SPACECRAFT: SATELLITE BUS, SATELLITE INTEGRATION AND TEST SERVICES, SATELLITE LAUNCH SUPPORT AND COMMISSIONING SERVICES, MISSION OPERATIONS, DATA ACQUISITION, AND ROUTING SERVICES.

open
Feb 24, 2035Up to $103,080,000

Johnson Space Center Multiple Award Construction Contract (JMACC)

open
Apr 6, 2026

COLD ATOM LAB (CAL) 70-18547

open
Sep 30, 2027Up to $71,710,000

ADVANCED EARTH SCIENCE MISSION CONCEPT STUDIES - SMD 83-11311

open
Sep 26, 2027Up to $72,290,000

ENVIRONMENTAL MONITORING FOR LONG DURATION EXPLORATION (EMLDE) 47-17229

open
Sep 30, 2027Up to $71,730,000

FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL

open
May 29, 2026Up to $73,050,000

NASA GSFC GEOSTATIONARY EXTENDED OBSERVATIONS (GEOXO) LIGHTNING MAPPER (LMX) INSTRUMENT IMPLEMENTATION. THE LMX INSTRUMENT IS A SINGLE SPECTRAL CHANNEL INSTRUMENT USED TO MEASURE THE LOCATION AND INTENSITY OF OPTICAL TRANSIENTS PRODUCED BY LIGHTNING.

open
Oct 9, 2049Up to $74,000,000

JOINT POLAR SATELLITE SYSTEM-2 SPACECRAFT. GD-300HP CORE SPACECRAFT INCLUDING ALL ASSOCIATED HARDWARE, SOFTWARE, SOURCE CODE, MAINTENANCE SYSTEM AND DOCUMENTATION FOR THE JPSS-2 SPACECRAFT MISSION.

open
Apr 30, 2028Up to $569,520,000

MASS CHANGE (MC) PRE-PHASE A AND PHASE A PLAN (89-109861)

open
Sep 30, 2028Up to $414,770,000

HIGH PERFORMANCE SPACEFLIGHT COMPUTING (HPSC) PROJECT THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONS

open
Jun 30, 2026Up to $90,550,000

EUROPA CLIPPER PROJECT THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNI

open
Sep 30, 2028Up to $2,950,000,000

REPAIR OF THE MECHANICAL SYSTEMS IN BUILDING 7- CREW SYSTEMS LABORATORY

open
Oct 8, 2026Up to $8,800,000

FLIGHT OPERATIONS AND MAINTENANCE FOR AIRCRAFT SERVICES.

open
Sep 30, 2026Up to $8,790,000

JPL SUPPORT FOR DRAGONFLY MISSION 42-108051

open
Aug 31, 2028Up to $8,910,000

REFURBISH POTABLE WATER SYSTEMS AND WATER METERS AT STENNIS SPACE CENTER, MS

open
Apr 19, 2026Up to $8,890,000

REPLACE AND REPAIR OF SANITARY SEWER SYSTEMS AT NASA LANGLEY RESEARCH CENTER - PHASE 1.

open
Apr 8, 2027Up to $8,980,000

THE STIS INSTRUMENT IS AN ADVANCED TECHNOLOGY SCIENTIFIC-GRADE FLIGHT INSTRUMENT THAT WILL BE DESIGNED AND DEVELOPED TO OPERATE IN THE INTERPLANETARY ENVIRONMENT AT LAGRANGE L1 APPROXIMATELY 1M MILES FROM EARTH TOWARDS THE SUN ON THE EARTH-SUN LINE

open
Aug 31, 2026Up to $9,030,000

LOGISTICS MANAGEMENT SUPPORT SERVICES

open
Apr 30, 2026Up to $9,160,000

JPL SUPPORT TO THE HUMAN EXPLORATION AND OPERATIONS MISSION DIRECTORATE SYSTEMS ENGINEERING AND INTEGRATION OFFICE 40-109535

open
Sep 30, 2026Up to $9,150,000

THE MINIATURE RADIO FREQUENCY (MINI-RF) SYNTHETIC APERTURE RADAR INSTRUMENT'S TEAM (JHU/APL) WILL PERFORM BI-STATIC SYNTHETIC APERTURE RADAR OBSERVATIONS OF THE LUNAR SURFACE USING THE DEEP SPACE NETWORK'S DSS-13 APERTURE AS THE X-BAND TRANSMISSION.

open
Jul 31, 2028Up to $9,270,000

PER- AND POLYFLUOROALKYL SUBSTANCES PRELIMINARY OR SOLID WASTE MANAGEMENT UNIT (SWMU) ASSESSMENT AND SITE INVESTIGATION OR CONFIRMATION SAMPLING AT VARIOUS NASA CENTERS OR FACILITIES

open
Jun 30, 2026Up to $9,750,000

DEVELOPMENT OF HIGH STRENGTH CARBON NANOTUBE YARN FOR STRUCTURAL.COMPOSITES

open
May 31, 2026Up to $9,730,000

PERFLUOROALKYL (PER)- AND POLYFLUOROALKYL SUBSTANCES SITE ASSESSMENT AND MITIGATION AT KENNEDY SPACE CENTER, FLORIDA

open
Jun 30, 2026Up to $9,830,000

SIMULATION AND SUPPORT SERVICES FOR LANGLEY RESEARCH CENTER.

open
Nov 30, 2026Up to $9,900,000

PHASE III - FLY FOUNDATIONAL ROBOTS (FFR) DEVELOPMENT AND DEMONSTRATION MISSION

open
Jul 1, 2027Up to $10,000,000

JPL SUPPORT TO BLUE FED FOR HUMAN LANDING SYSTEM BASE PERIOD (40-109108)

open
May 1, 2027Up to $9,910,000

CROSS-SCALE INVESTIGATION OF EARTH'S MAGNETOTAIL AND AURORA (CINEMA) MISSION SUPPORT UNDER ARDES II 80MSFC20D0004

open
Jun 30, 2026Up to $10,130,000

PROVIDE CONTINUED MISSION OPERATIONS AND DATA PROCESSING SUPPORT SERVICES TO CONTINUE PERFORMING KEY CLIMATE MEASUREMENTS THROUGH TOTAL AND SPECTRAL SOLAR IRRADIANCE SENSOR SYSTEMS CURRENTLY IN OPERATION ON THE INTERNATIONAL SPACE STATION.

open
Jun 19, 2026Up to $10,120,000

THIS CONTRACT PROCURES ELECTRICITY (SUPPLY AND DELIVERY) FOR NASA'S GODDARD SPACE FLIGHT CENTER (GSFC) MAIN CAMPUS IN GREENBELT, MD AND RESPECTIVE AREAS 100, 200, 300, AND 400.

open
Nov 30, 2026Up to $10,370,000

SOLAR SYSTEM TREKS PROJECT 47-700074

open
Jan 31, 2028Up to $10,560,000

FILMSS 2 CODE S IDIQ TASK ORDER: TO PROVIDE PROGRAM, SCIENCE, ENGINEERING, OPERATIONS AND PROJECT MANAGEMENT SUPPORT FOR BIOSCIENCES FLIGHT DEVELOPMENT PROJECTS AND COLLABORATIVE SCIENCE PROGRAMS.

open
Nov 30, 2026Up to $10,920,000

TECHNICAL EVALUATION OF JPL SUPPORT OF NASA OFFICE OF STEM ENGAGEMENT PROGRAMS (18-710500)

open
Apr 30, 2026Up to $11,120,000

KSC ELECTRIC UTILITY SERVICE

open
Jun 30, 2027Up to $11,070,000

IND OMNIBUS SUPPORT AGREEMENT FOR NASA DIRECTED MISSIONS (91-210214)

open
Mar 27, 2027Up to $11,150,000

JPL SUPPORT TO THE LANDER TECHNOLOGY PROJECT 47-700008

open
Sep 30, 2026Up to $11,120,000

NASA NTSS CONTRACT YEAR 3 TASK ORDER

open
Sep 30, 2026Up to $11,350,000

IGF::OT::IGF "GLOBAL ECOSYSTEM DYNAMICS INVESTIGATION LIDAR (GEDI)" PRINCIPAL INVESTIGATOR (PI)SUPPORT FOR THE GLOBAL ECOSYSTEM DYNAMICS INVESTIGATION (GEDI) LIDAR INVESTIGATION. THE GEDI LIDAR INVESTIGATION WILL REQUIRE A LASER-BASED SYSTEM DEVELOPED AT NASA GODDARD SPACE FLIGHT CENTER (GSFC) TO OBSERVE THE STRUCTURE OF FOREST CANOPY. THE PROJECT WILL USE A LASER-BASED SYSTEM TO STUDY A RANGE OF CLIMATES, INCLUDING THE OBSERVATION OF THE FOREST CANOPY STRUCTURE OVER THE TROPICS, AND THE TUNDRA IN HIGH NORTHERN LATITUDES. THIS DATA WILL HELP SCIENTISTS BETTER UNDERSTAND THE CHANGES IN NATURAL CARBON STORAGE WITHIN THE CARBON CYCLE FROM BOTH HUMAN-INFLUENCED ACTIVITIES AND NATURAL CLIMATE VARIATIONS.

open
Sep 30, 2027Up to $11,440,000

NASA FIRE SERVICES CONTRACT - KSC PROGRAM MANAGEMENT AND BASELINE FIRE SERVICES FOR FY26

open
Sep 30, 2026Up to $11,460,000

COMPRESSOR STATION UPGRADES, PHASE 2

open
Apr 30, 2026Up to $11,670,000

FY24 SBIR PHASE III - SSPICY - STARFISH SPACE ORBITAL DEBRIS INSPECTION MISSION

open
Jun 15, 2027Up to $12,000,000

JPL SUPPORT OF DEEP ATMOSPHERE VENUS INVESTIGATION OF NOBLE GASES, CHEMISTRY, AND IMAGING PLUS (DAVINCI+) PROJECT PHASE B (40-109970)

open
Sep 27, 2026Up to $12,040,000

THE PURPOSE OF THIS CONTRACT IS TO ACQUIRE SCIENTIFIC SUPPORT AND RELATED SERVICES FOR THE GISS FACILITY IN NEW YORK CITY, NY.

open
Feb 28, 2027Up to $12,350,000

EXOMARS TRACE GAS ORBITER (TGO) MISSION: PHASE A 60-15345

open
Oct 31, 2027Up to $12,520,000

JPL MULTIRESOLUTION GREENHOUSE SYSTEM (JPL-MGHG) WITH EMIT GREENHOUSE GAS CONTRIBUTION TO THE GHG CENTER (83-212606)

open
Sep 30, 2028Up to $12,380,000

DTN SPACE INTERNETWORKING 97-700078

open
Sep 26, 2027Up to $12,520,000

RENOVATE AEROSPACE GROUND EQUIPMENT (AGE) FACILITY CONSTRUCTION

open
Aug 10, 2026Up to $12,660,000

SIMULATION AND ADVANCED SOFTWARE SERVICES II (SASS II) TASK ORDER

open
Sep 30, 2030Up to $12,900,000

REPLACE ROOF AND ROOFTOP HEATING, VENTILATING AND AIR CONDITIONING (HVAC) EQUIPMENT ON THE BOOSTER FABRICATION FACILITY (BFF) COMPLEX MANUFACTURING AND ADMINISTRATION BUILDING.

open
May 22, 2026Up to $13,090,000

EO14042 PROVIDES THE DESIGN, ANALYSIS, FABRICATION, TESTING, QUALITY ASSURANCE, DOCUMENTATION, AND DELIVERY OF A PARACHUTE DECELERATOR SUBSYSTEM THAT WILL OFFER THE DECELERATION NECESSARY TO DELIVER THE DRAGONFLY MISSION LANDER TO SURFACE OF TITAN.

open
Apr 30, 2027Up to $13,310,000

RESEARCH AND ANALYSIS (R&A), HYDROLOGY AND WEATHER SCIENCE PROGRAM

open
Sep 26, 2027Up to $13,320,000

SBIR PHASE III - CREARE LLC - 90 K 30 W CRYOCOOLER DESIGN AND DEMONSTRATION

open
Oct 16, 2028Up to $13,170,000

DELIVERY ORDER FOR LIQUID NITROGEN FOR STENNIS SPACE CENTER (SSC) AS DESCRIBED ON KENNEDY SPACE CENTER'S (KSC'S) BASE CONTRACT.

open
Jun 30, 2029Up to $13,460,000

COMMERCIAL SATELLITE DATA ACQUISITION (CSDA) PROGRAM. TASK ORDER FOR ELECTRO OPTICAL TASKING DATA.

open
Nov 24, 2026Up to $13,500,000

AEROSPACE TESTING AND FACILITIES OPERATIONS AND MAINTENANCE (ATOM-5) - CTO 49

open
Dec 31, 2026Up to $13,470,000

RESEARCH OPPORTUNITIES FOR SPACE AND EARTH SCIENCES (ROSES)

open
Sep 30, 2028Up to $13,970,000

THE SPACE WEATHER FOLLOW ON (SWFO-L1) MISSION MAGNETOMETER SUITE (MAG) JOINT UNDERTAKING BETWEEN NASA AND NOAA.

open
Jun 30, 2026Up to $13,850,000

SBIR PHASE III XOGDOR VEHICLE ENHANCEMENTS

open
Aug 31, 2029Up to $14,000,000

LUNAR SURFACE INNOVATION INITIATIVE (LSII) UNDER ARDES II 80MSFC20D0004

open
Dec 31, 2026Up to $14,140,000

THIS EFFORT IS FOCUSED ON THE DEMONSTRATION AND CHARACTERIZATION OF A V-BAND CROSS-LINK CAPABILITY TO ALLOW NASA TO ASSESS THE POTENTIAL FOR V-BAND CROSS-LINKS TO ENABLE LOW LATENCY TRANSMISSION OF LARGE VOLUMES OF SCIENCE DATA.

open
Feb 9, 2030Up to $14,220,000

THE OBJECTIVE OF THIS EFFORT IS TO PROVIDE NASA AND OTHER U.S. GOVERNMENT AGENCIES (WORKING THROUGH NASA) WITH A DOMESTIC, NORTHERN LATITUDE, SOUNDING ROCKET LAUNCH SITE FOR CONDUCTING SCIENTIFIC INVESTIGATIONS.

open
Nov 30, 2026Up to $14,470,000

STANDARDS THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNI

open
Sep 30, 2027Up to $14,520,000

ELECTRICITY SUPPLY & ANCILLARY SERVICES FOR JSC (JSC, EF, SCTF)

open
Jan 31, 2027Up to $14,430,000

ASTER SCIENCE TEAM LEAD 87-11798

open
Sep 30, 2028Up to $14,720,000

LASER PRESTABILIZATION SYSTEM (LPS) FOR THE LASER INTERFEROMETER SPACE ANTENNA (LISA) SYSTEM

open
Jan 29, 2027Up to $15,050,000

JOINT EUV CORONAL DIAGNOSTIC INVESTIGATION (JEDI) EFFORT. PHASE A WORK INCLUDES INSTRUMENT REQUIREMENTS DEFINITION, INSTRUMENT MANAGEMENT, SYSTEM ENGINEERING, INSTRUMENT SAFETY & MISSION ASSURANCE, AND SYSTEM INTEGRATION PLANNING.

open
May 23, 2026Up to $15,500,000

TEST OPERATIONS CONTRACT COVERS TEST OPERATIONS SUPPORT FOR TEST CUSTOMERS, AS WELL AS THE OPERATION AND TECHNICAL SYSTEMS MAINTENANCE OF THE HIGH PRESSURE INDUSTRIAL WATER, HIGH PRESSURE GAS, AND CRYO PROPELLANT STORAGE SUPPORT AREAS.

open
Jun 30, 2026Up to $15,400,000

ONE-METER CLASS DRILLING FOR PLANETARY EXPLORATION

open
May 30, 2026Up to $15,390,000

THE CONTRACTOR SHALL DESIGN, DEVELOP, AND DELIVER AN INSTRUMENT FOR THE LUNAR SURFACE ELECTROMAGNETICS EXPERIMENT AT NIGHT.

open
Sep 30, 2027Up to $15,510,000

SCIENCE MISSION DIRECTORATE, RESEARCH AND ANALYSIS FOR SPACE SCIENCE, TERRESTRIAL PLANETS AND LUNAR SCIENCE

open
Sep 30, 2028Up to $15,770,000

CONSTRUCTION PROJECT TO UPGRADE THE 22 KV ELECTRICAL DISTRIBUTION SYSTEM. ELECTRICAL INFRASTRUCTURE UPGRADES

open
Apr 9, 2026Up to $15,870,000

ADVANCED INFORMATION SYSTEMS TECHNOLOGY (AIST) 21 (87-200689)

open
May 31, 2026Up to $16,120,000

KENNEDY PROPELLANT AND LIFE SUPPORT SERVICES (KPLSS) II FY26 CUSTOMER FUNDING.

open
Sep 30, 2026Up to $15,960,000

THE GREAT OBSERVATORY MATURATION PROGRAM (GOMAP) (71-215312)

open
Sep 27, 2026Up to $16,000,000

BOOSTER FABRICATION FACILITY (BFF) INTERIORS RENOVATIONS, KENNEDY SPACE CENTER, FLORIDA

open
Feb 26, 2027Up to $16,090,000

THE PURPOSE OF THIS NEGOTIATION IS TO DEFINITIZE THE UNIVERSITY OF NEW HAMPSHIRE (UNH) PROPOSAL FOR PHASE E EFFORT ON THE COSMIC RAY TELESCOPE FOR THE EFFECTS OF RADIATION (CRATER) INSTRUMENT FOR THE LUNAR RECONNAISSANCE ORBITER (LRO) PROJECT. THIS CONTRACT IS A RESULT OF A PI TRANSFER.

open
Aug 31, 2028Up to $16,240,000

AEROSPACE TESTING AND FACILITIES OPERATION AND MAINTENANCE - TASK IS TO PROVIDE SUPPORT FOR TEST PLANNING, TEST PREPARATION, TEST OPERATION, POST-TEST ACTIVATES, FACILITY OPERATION, SYSTEMS.

open
Jun 1, 2026Up to $16,510,000

PROGRAM ANALYSIS AND EVALUATION STANDING REVIEW BOARDS SUPPORT 15-15038

open
Sep 30, 2028Up to $16,570,000

THIS COSMIC TASK ORDER IS CREATED FOR FUNDING OF THE COSMIC CORE SERVICES FOR COST PRICE INCENTIVE FEE CLIN 1004 OF 80SSC025D0001.

open
Sep 30, 2026Up to $17,140,000

REPLACE NEIL ARMSTRONG OPERATIONS AND CHECKOUT (O&C) SOUTH WING ELECTRICAL DISTRIBUTION EQUIPMENT AT KENNEDY SPACE CENTER, FL.

open
Oct 6, 2028Up to $17,410,000

TECHNICAL WORKFORCE EDUCATION AND EXPERTISE DEVELOPMENT SERVICES (TWEEDS) IN SUPPORT OF THE APPEL KS PROGRAM

open
Oct 31, 2026Up to $17,390,000

TEST ARTICLE - IF MORE INFORMATION IS NEEDED, PLEASE CONTACT THE CO DIRECTLY.

open
Mar 31, 2027Up to $17,530,000

COMBINED OPERATIONS, SERVICES, MAINTENANCE, AND INFRASTRUCTURE CONTRACT (COSMIC) BASE YEAR - CORE COST-PLUS INCENTIVE FEE (CPIF) FUNDING ORDER

open
Sep 30, 2026Up to $17,830,000

DEEP SPACE LOGISTICS ENGINEERING SUPPORT (LENS) TASK ORDER ISSUED UNDER THE GENERAL SERVICES ADMINISTRATION (GSA) ONE ACQUISITION SOLUTION FOR INTEGRATED SERVICES (OASIS).

open
Nov 29, 2026Up to $17,700,000

SENTINEL-6C PREPARATORY PROJECT (89-210199)

open
Apr 30, 2026Up to $18,120,000

THIS CONTRACT PROVIDES ASSISTANCE IN MEETING THE OBJECTIVES OF THE GSFC ENVIRONMENTAL MANAGEMENT PROGRAM.

open
Jul 31, 2026Up to $18,170,000

ELECTRIC PROPULSION SUPPORT TO THE ADVANCED ELECTRIC PROPULSION SYSTEM (AEPS) ACQUISITION AND DELIVERY THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILI

open
Sep 30, 2028Up to $18,560,000

JPL SUPPORT TO SPACEX FOR HUMAN LANDING SYSTEM BASE PERIOD (40-109107)

open
Nov 15, 2027Up to $18,950,000

INFRARED SCIENCE ARCHIVE (IRSA) THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNME

open
Sep 30, 2026Up to $18,820,000

KECK SINGLE APERTURE (KSA) OPERATIONS 79-15015

open
Sep 30, 2028Up to $19,000,000

COMMERCIAL LUNAR PAYLOAD SERVICES (CLPS)

open
Aug 31, 2028Up to $88,030,000

SPECTRUM THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNIQ

open
Sep 30, 2028Up to $20,010,000

COST-PLUS FIXED FEE (CPFF) IDIQ TASK ORDER UNDER INTELLIGENT SYSTEMS RESEARCH AND DEVELOPMENT SUPPORT-3 CONTRACT NO. 80ARC020D0010 TO PROVIDE TECHNICAL ADVANCEMENT TO SUPPORT THE INTELLIGENT SYSTEM DIVISION AT ARC.

open
Apr 30, 2026Up to $20,260,000

NASA ADVANCED SUPER COMPUTING (NACS) GSFC PROCUREMENT TASK ORDER (OY7/CY8)

open
Jun 30, 2026Up to $20,630,000

MISSION ENABLING SERVICES CONTRACT (MESC) BASELINE A -NASA AIRCRAFT MANAGEMENT INFORMATION SYSTEM (NAMIS)

open
Sep 30, 2027Up to $21,010,000

EZIE: ELECTROJET ZEEMAN IMAGING EXPLORER 71-107848

open
Apr 30, 2027Up to $21,660,000

HELIOSWARM PROGRAM SUPPORT

open
Aug 31, 2026Up to $11,970,000

SPACE SCIENCE & TECHNOLOGY EVALUATION FACILITY FIRST FLIGHT. A GENERAL-PURPOSE LUNAR TESTBED PROVIDING POWER AND DATA SERVICES TO INDIVIDUAL EXPERIMENTS/PAYLOADS FOR TESTING AT LUNAR SURFACE

open
Aug 10, 2026Up to $22,100,000

U.S. PARTICIPATION IN RADAR FOR ICY MOON EXPLORATION (RIME) INSTRUMENT DEVELOPMENT FOR JUPITER ICY MOON EXPLORER (JUICE) 42-19087

open
Sep 30, 2028Up to $22,110,000

AVIATION LOGISTICS OPERATIONS FACILITY (ALOF) DESIGN-BUILD

open
Apr 14, 2027Up to $22,250,000

CONSTRUCTION OF CENTER FACILITY SUPPORT BUILDING - BUILDING 22

open
Sep 15, 2026Up to $22,040,000

ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) 50-13143

open
Sep 30, 2028Up to $22,860,000

JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY (JHU/APL) SUPPORTS PLANETARY SCIENCE WORK IN NASA'S RADIOISOTOPE POWER SYSTEMS (RPS) PROGRAM AND ITS CONSTITUENT PROJECTS, AND NASA'S PLANETARY EXPLORATION SCIENCE TECHNOLOGY OFFICE (PESTO).

open
Apr 30, 2026Up to $22,670,000

JPL SUPPORT TO THE HUMAN LANDING SYSTEM (HLS) PROGRAM (40-108827)

open
Sep 26, 2027Up to $22,450,000

ENGINEERING SERVICES

open
Dec 31, 2027Up to $22,540,000

PHASE III - CAPSTONE EXTENDED MISSION

open
Sep 30, 2026Up to $23,540,000

MISSION OPERATIONS SUPPORT FOR AQUILLA II SPACECRAFT

open
Jun 30, 2026Up to $23,070,000

THE CONTRACTOR WILL PROVIDE THE PRODUCTS AND SERVICES TO SUPPORT THE JAMES WEBB SPACE TELESCOPE PHASE E OPERATIONS AND SUSTAINMENT.

open
Jun 24, 2027Up to $23,830,000

SPACE TECHNOLOGY - (SPACETECH - REDDI- 2020), 80HQTR20NOA01 AMENDMENT1, "UTILIZING PUBLIC-PRIVATE PARTNERSHIPS TO ADVANCE TIPPING POINT TECHNOLOGIES"...ETA SPACE, LLC. - LOXSAT 1

open
Apr 27, 2027Up to $24,250,000

SAFETY AND MISSION ASSURANCE SUPPORT SERVICES (SMASS) IV

open
Sep 30, 2026Up to $25,080,000

LAUNCH CONTROL CENTER AND VEHICLE ASSEMBLY BUILDING HEATING VENTILATION AND AIR CONDITIONING REPLACEMENT.

open
Apr 30, 2027Up to $25,140,000

THE PURPOSE OF THIS TASK ORDER IS TO REPLACE THE ROOF OF THE MAIN MANUFACTURING BUILDING AT MICHOUD ASSEMBLY FACILITY, BUILDING 103, WHICH SUPPORTS SPACE LAUNCH SYSTEM (SLS) AND ORION MANUFACTURING.

open
Jun 19, 2028Up to $25,900,000

IGF::OT::IGF BAA - NEXT SPACE TECHNOLOGIES FOR EXPLORATION PARTNERSHIPS (NEXTSTEP) PROPOSAL - HABITATION. NASA HAS INCREASINGLY EMBRACED PUBLIC-PRIVATE PARTNERSHIPS FOR ACHIEVING ITS STRATEGIC GOALS AND OBJECTIVES FOR EXPANDING THE FRONTIERS OF KNOWLEDGE, CAPABILITY, AND OPPORTUNITIES IN SPACE. THE NEXT STEP FOR HUMAN SPACEFLIGHT IS THE DEVELOPMENT OF DEEP SPACE EXPLORATION CAPABILITIES TO SUPPORT MORE EXTENSIVE MISSIONS IN THE PROVING GROUND AROUND AND BEYOND CISLUNAR SPACE. AN IMPORTANT PART OF NASAS STRATEGY IS TO STIMULATE THE COMMERCIAL SPACE INDUSTRY WHILE LEVERAGING THOSE SAME COMMERCIAL CAPABILITIES THROUGH FUTURE CONTRACTS AND PUBLIC-PRIVATE PARTNERSHIPS TO DELIVER MISSION CAPABILITIES. NASAS ACTIVITIES IN ENABLING THE PIONEERING OF SPACE ARE BEING DRIVEN BY A SET OF GUIDING PRINCIPLES: IMPLEMENTABLE IN THE NEAR-TERM WITH THE BUYING POWER OF CURRENT BUDGETS AND IN THE LONGER TERM WITH BUDGETS COMMENSURATE WITH ECONOMIC GROWTH; EXPLORATION ENABLES SCIENCE AND SCIENCE ENABLES EX

open
Apr 30, 2026Up to $25,670,000

ICE, CLOUD, AND LAND ELEVATION-2 (ICESAT-2) MISSION OPERATIONS CENTER (MOC) SUPPORT CENTER CONTRACT - PROVIDE HIGHLY SPECIALIZED ENGINEERING SERVICES FOR MISSION OPERATIONS SUPPORT TO MEET ICESAT-2 SCIENCE OBJECTIVES.

open
Nov 14, 2026Up to $27,380,000

WIDEBAND TERMINAL FLIGHT DEMONSTRATION TASK ORDER UNDER 80MSFC20D0004 AEROSPACE RESEARCH, DEVELOPMENT AND ENGINEERING SUPPORT (ARDES) II.

open
Apr 30, 2027Up to $28,310,000

SCIENCE MISSION DIRECTORATE, EARTH SCIENCE APPLIED SCIENCE PROGRAM THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PR

open
Aug 30, 2026Up to $27,690,000

MARS TECHNOLOGY DEVELOPMENT 60-17814

open
Sep 30, 2028Up to $29,820,000

SBIR PHASE III - 80NSSC25C0510 - SWIFT SALVO

open
Sep 1, 2026Up to $29,800,000

SPACE WEATHER CORONAGRAPH - EFFORTS INCLUDE INTEGRATE, TEST, CALIBRATE, EVALUATE, AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE CORONAGRAPH INSTRUMENTS.

open
Jan 31, 2034Up to $30,300,000

SPECIAL STUDIES

open
Sep 27, 2029Up to $30,430,000

"IGF::OT::IGF" OTHER FUNCTIONS - TROPOSPHERIC EMISSIONS: MONITORING OF POLLUTION (TEMPO) - THE TEMPO INVESTIGATION WAS SELECTED UNDER THE NASA SECOND STAND ALONE MISSIONS OF OPPORTUNITY NOTICE (SALMON-2) ANNOUNCEMENT OF OPPORTUNITY (AO) PROGRAM ELEMENT APPENDIX J, NNH12ZDA006O-EVI1 FOR THE EARTH VENTURE INSTRUMENT-1 (EVI-1) ELEMENT OF THE EARTH SYSTEM SCIENCE PATHFINDER (ESSP) PROGRAM OFFICE'S EARTH VENTURE LINE. TEMPO MEASURES POLLUTION OF NORTH AMERICA, FROM MEXICO CITY TO THE CANADIAN TAR/OIL SANDS, AND FROM THE ATLANTIC TO THE PACIFIC, HOURLY AND AT HIGH SPATIAL RESOLUTION. TEMPO SPECTROSCOPIC MEASUREMENTS IN THE ULTRAVIOLET AND VISIBLE AND PROVIDES A TROPOSPHERIC MEASUREMENT SUITE THAT INCLUDES THE KEY ELEMENTS OF TROPOSPHERIC AIR POLLUTION CHEMISTRY. MEASUREMENTS ARE FROM GEOSTATIONARY ORBIT, TO CAPTURE THE INHERENT HIGH VARIABILITY IN THE DIURNAL CYCLE OF EMISSIONS AND CHEMISTRY. A SMALL PRODUCT SPATIAL FOOTPRINT RESOLVES POLLUTION SOURCES AT SUB-URBAN SCALE. TOGETHER, THIS TEMP

open
Mar 31, 2028Up to $31,190,000

DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT

open
Sep 30, 2028Up to $32,060,000

ETA

open
Sep 30, 2028Up to $31,180,000

VENTURE-CLASS ACQUISITION OF DEDICATED AND RIDESHARE (VADR) UMBRELLA TASK ORDER

open
Feb 3, 2027Up to $24,170,000

MULTIANGLE IMAGING SPECTRORADIOMETER (MISR) INSTRUMENT SUPPORT AND GEOPHYSICAL DATA PRODUCT VERIFICATION REFINEMENT AND VALIDATION 83-8225

open
Jun 30, 2026Up to $32,450,000

THIS TASK ORDER IS FOR MICROSOFT M365 G5 LICENSES PER ATTACHED QUOTE # MTG-NASA-MIC-05249 DATED 04/23/2025. THE TASK ORDER INCORPORATES FAR 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT.

open
Apr 30, 2026Up to $33,260,000

THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH.

open
May 31, 2028Up to $32,530,000

ENTERPRISE INFRASTRUCTURE SOLUTIONS (EIS) - MISSION

open
Sep 30, 2026Up to $34,040,000

DEMOLITION OF BUILDING 1100 CENTER SECTION AND WEST WING AT STENNIS SPACE CENTER, MS

open
Feb 15, 2029Up to $33,800,000

FY22 SBIR PHASE III - DESIGN, DEVELOPMENT, FABRICATION TESTING, AND DELIVERY OF LUNAR CONSTRUCTION SYSTEM FOR DEMONSTRATION

open
Mar 28, 2028Up to $33,370,000

THIS PROCUREMENT PROVIDES FOR THE LABOR, TRAVEL AND ASSOCIATED BURDENS NECESSARY TO SATISFY THE PHASE A CONCEPT STUDY REPORT (CSR) AND BRIDGE PHASE B OPTION REQUIREMENTS OF NASA'S COMPETITIVELY SELECTED DAVINCI+ MISSION.

open
Oct 31, 2026Up to $34,380,000

ECOSYSTEMS SPACEBORNE THERMAL RADIOMETER EXPERIMENTS ON SPACE STATION (ECOSTRESS) 87-19641

open
Mar 28, 2027Up to $35,120,000

STROFIO - PHASE B IS AWARDED FROM ANNOUNCEMENT OF OPPORTUNITY (AO) NNM08ZDA009O, STAND ALONE MISSION OF OPPORTUNITY NOTICE (SALMON) ISSUED BY NASA HEADQUARTERS. SOUTHWEST RESEARCH INSTITUTE (SWRI) WAS SELECTED FOR "STROFIO: EXOSPHERIC SAMPLING OF MERCURY'S SURFACE COMPOSITION" WITH DR. STEFANO LIVI AS THE PRINCIPAL INVESTIGATOR FOR FUNDING AND APPROVED TO DIRECTLY ENTER PHASE B PRELIMINARY DESIGN AND TECHNOLOGY COMPLETION. STROFIO WAS SELECTED BECAUSE IT IS TIMELY AND TAKES ADVANTAGE OF A UNIQUE OPPORTUNITY FOR NASA TO PARTICIPATE THROUGH THIS INVESTIGATION IN THE BEPICOLOMBO MISSION. THE ANTICIPATED OBSERVATIONS OF MERCURY'S EXOSPHERE WILL BE UNIQUE AND COMPLEMENTARY TO INVESTIGATIONS CONDUCTED BY MARINER, MESSENGER AND THE OTHER INSTRUMENTS ON BEPICOLOMBO. THE PROPOSED INVESTIGATION WILL PROVIDE VALUABLE INFORMATION ABOUT MERCURY'S EXOSPHERE AND ITS INTERACTION WITH THE MAGNETOSPHERE AND SURFACE. THE STROFIO INSTRUMENT WILL PROVIDE A VALUABLE SCIENTIFIC RETURN, ADDRESSING MANY GOALS

open
Apr 30, 2028Up to $34,530,000

ACQUIRE SERVICES FOR THE CONTINUED DEVELOPMENT AND OPERATION OF THE SYNTHETIC APERTURE RADAR DISTRIBUTED ACTIVE ARCHIVE CENTER FOR NASAS EARTH OBSERVING SYSTEM DATA AND INFORMATION SYSTEM.

open
Jun 30, 2026Up to $36,210,000

PHASE A/B DEVELOPMENT OF THE JUICE ULTRAVIOLET SPECTROGRAPH IGF::CT,CL::IGF THE EUROPEAN SPACE AGENCY SELECTED THE JUPITER ICY MOONS EXPLORER (JUICE) MISSION AS THE FIRST MISSION IN ITS LARGE-CLASS MISSION PORTFOLIO UNDER THE COSMIC VISION PROGRAM. THE JUICE MISSION WILL INVESTIGATE JUPITER AND ITS ICY MOONS, COMPLETING ITS MISSION BY ORBITING GANYMEDE. THE MISSION IS PLANNED FOR LAUNCH IN 2022. THE NASA SCIENCE MISSION DIRECTORATE (SMD) HAS OFFERED TO COLLABORATE IN THIS MISSION. IN 2012, NASA ISSUED PROGRAM ELEMENT APPENDIX (PEA) K AS AN APPENDIX OF THE SECOND STAND ALONE MISSIONS OF OPPORTUNITY NOTICE (SALMON-2)(NNH12ZDA006O-JUICE) ANNOUNCEMENT OF OPPORTUNITY (AO)(NNH12ZDA006O) FOR THE PURPOSE OF SOLICITING PROPOSALS FOR JUICE MISSION OF OPPORTUNITY (MO) INVESTIGATIONS TO BE MANAGED UNDER THE NASA NEW FRONTIERS PROGRAM. THE JUICE ULTRAVIOLET IMAGING SPECTROGRAPH (JUICE-UVS) IS A COMPLETE, STAND-ALONE INSTRUMENT PROPOSED AND SELECTED UNDER THE SALMON-2 AO, TO BE INCLUDED IN THE ESA J

open
Sep 30, 2036Up to $37,560,000

PREFIRE (POLAR RADIANT ENERGY IN THE FAR INFRARED EXPERIMENT THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILIT

open
Mar 31, 2028Up to $37,130,000

PROVIDE ENGINEERING ANALYSES, HARDWARE & SOFTWARE DEVELOPMENT, FABRICATION, INTEGRATION, TEST, EVALUATION, INTEGRATION WITH SPACECRAFT, LAUNCH, INSTRUMENT ACTIVATION, CALIBRATION, VALIDATION, & OPERATIONS THROUGH 60-DAY CHECKOUT FOR TSIS2 PAYLOAD.

open
Dec 12, 2026Up to $36,970,000

LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE

open
Sep 30, 2028Up to $37,450,000

THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT.

open
Mar 31, 2027Up to $40,060,000

IGF::CT::IGF THIS "TASK ORDER" HAS BEEN CREATED IN THE CONTRACT MANAGEMENT MODULE (CMM) SYSTEM FOR FUNDING PURPOSES ONLY AND IS NOT AN ACTUAL TASK ORDER WITH A STATEMENT OF WORK AND OTHER TASK ORDER REQUIREMENTS. THIS "TASK ORDER" HAS BEEN CREATED FOR FUNDING OBLIGATIONS ONLY AND TO ACCOUNT FOR CMM AND SAP FINANCIAL SYSTEM FUNCTIONALITY. THIS "TASK ORDER" IS TO FUND NNL13AA14C CLIN 3 (ENGINEERING). CENTER MAINTENANCE, OPERATIONS, AND ENGINEERING (CMOE) CONTRACT. REQUIREMENT FOR THE MAINTENANCE, OPERATIONS, AND ENGINEERING OF LARC'S INSTITUTIONAL FACILITIES AND HIGHLY TECHNICAL RESEARCH FACILITIES FOR MISSION SUCCESS. THE CMOE CONTRACT WILL PROVIDE CORE SUPPORT SERVICES TO LARC IN THE AREAS OF INSTITUTIONAL AND RESEARCH OPERATIONS, MAINTENANCE, AND ENGINEERING (OME). THESE TECHNICAL SERVICES INCLUDE: RESEARCH FACILITIES OPERATIONS (E.G., HIGHLY SPECIALIZED WIND TUNNELS, LABORATORIES, TEST STANDS, INSTRUMENTATION CALIBRATION/REPAIR); CENTRAL UTILITIES OPERATIONS (E.G., STEAM, COMPRESSED

open
Jul 31, 2026Up to $38,330,000

CASE: CONTRIBUTION TO ARIEL SPECTROSCOPY OF EXOPLANETS 71-700092

open
Jun 30, 2030Up to $39,770,000

IDIQ PROCUREMENT SERVICES TASK ORDER UNDER NASA ADVANCED COMPUTING SERVICES (NACS) CONTRACT.

open
Jun 30, 2026Up to $40,020,000

CHARLES CONTRACT TO PROVIDE SUPPORT FOR AIRCRAFT AT LARC. INCLUDES AIRCRAFT MAINTENANCE, FLIGHT OPERATIONS, ENGINEERING, LIFECYCLE, QUALITY, SAFETY, AND OTHER RELATED SUPPORT FOR A VARIETY OF AIRFRAMES, ENGINES, APPLIANCES, AND SUPPORT EQUIPMENT

open
Feb 28, 2027Up to $39,460,000

THIS COSMIC TASK ORDER IS CREATED FOR FUNDING OF THE COST-PLUS-INCENTIVE-FEE CLIN 9002 OF 80SSC025D0001.

open
Sep 30, 2033Up to $39,000,000

MICROWAVE LIMB SOUNDER (MLS) MISSION OPERATIONS 88-9539

open
Jun 30, 2026Up to $41,130,000

TO PROVIDE SPACECRAFT DEVELOPMENT & TEST OBSERVATORY I&T OBSERVATORY TESTING SHIPMENT TO THE LAUNCH SITE SUPPORT OF LAUNCH OPERATIONS ON-ORBIT PERFORMANCE VERIFICATION OPERATION OF MISSION OPERATIONS CENTER, 3 YEARS MISSION OPS&DECOMMISSIONING.

open
Oct 27, 2026Up to $42,940,000

SYSTEMS ENGINEERING FOR SPACE MODERNIZATION INITIATIVE DIRECT MISSION SUPPORT

open
Jun 8, 2026Up to $42,430,000

IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT

open
Jun 9, 2039Up to $44,030,000

GODDARD LOGISTICS SERVICES CONTRACT - THE PRINCIPAL PURPOSE OF THIS REQUIREMENT IS TO SUPPORT NASA GSFC LOGISTICS MANAGEMENT NEEDS IN ORDER TO MEET EARTH SCIENCE, SPACE SCIENCE, AND EXPLORATION MISSION REQUIREMENTS.

open
Jul 31, 2026Up to $44,020,000

RESEARCH AND ANALYSIS (R&A), TERRESTRIAL ECOLOGY AND CARBON CYCLE SCIENCE

open
Sep 26, 2027Up to $45,270,000

IGF::CL,CT::IGF PSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT O

open
Aug 31, 2032Up to $45,230,000

NASA-WIDE SPECIALIZED ENGINEERING, EVALUATION AND TEST SERVICES (NSEETS).

open
Sep 30, 2028Up to $45,770,000

EXOPLANET EXPLORATION (EXEP) PROGRAM OFFICE (73-108020)

open
Sep 30, 2028Up to $45,930,000

RESEARCH AND ANALYSIS (R&A), EARTH SYSTEM MODELING AND ANALYSIS

open
Sep 26, 2027Up to $47,100,000

SOLAR B X RAY TELESCOPE PHASE E

open
Jun 30, 2026Up to $46,570,000

NRESS-II MANAGEMENT AND IT SUPPORT

open
Jul 31, 2026Up to $47,760,000

ATMOSPHERIC INFRARED SOUNDER (AIRS) ADVANCED MICROWAVE SOUNDING UNIT (AMSU) HUMIDITY SOUNDER FROM BRAZIL (HSB) PROJECT TEAM LEADER FACILITY 88-8223

open
Sep 30, 2026Up to $47,430,000

DEVELOPMENT OF THE QUICKSOUNDER SC AND THE QUICKSOUNDER SATELLITE, INTEGRATION OF THE ATMS EDU, SHIPMENT TO THE LAUNCH SITE SUPPORT OF LAUNCH OPS & SATELLITE ACTIVATION, 3 YRS OF MISSION OPS & PERFORM DECOMMISSIONING OPERATION

open
Aug 29, 2029Up to $49,040,000

JPL PLANETARY DATA SYSTEMS (PDS) NODES AND SUB-NODES (93-109847)

open
Sep 20, 2027Up to $48,970,000

RUSSIAN LANGUAGE AND LOGISTICS SERVICES.

open
Sep 30, 2026Up to $48,330,000

INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) IS A WATERSHED MISSION THAT SIMULTANEOUSLY INVESTIGATES THE ACCELERATION OF ENERGETIC PARTICLES AND INTERACTION OF THE SOLAR WIND WITH THE LOCAL INTERSTELLAR MEDIUM. IMAP WILL 1) ADVANCE THE UNDERSTANDING OF THE TEMPORAL AND SPATIAL EVOLUTION OF THE BOUNDARY REGION IN WHICH THE SOLAR WIND AND INTERSTELLAR MEDIUM INTERACT, 2) IDENTIFY AND ADVANCE THE UNDERSTANDING OF PROCESSES RELATED TO THE INTERACTIONS OF THE MAGNETIC FIELD OF THE SUN AND THE LOCAL INTERSTELLAR MEDIUM, 3) IMPROVE THE UNDERSTANDING OF THE COMPOSITION AND PROPERTIES OF THE LOCAL INTERSTELLAR MEDIUM, AND 4) IDENTIFY AND ADVANCE THE UNDERSTANDING OF PARTICLE INJECTION AND ACCELERATION PROCESSES NEAR THE SUN, IN THE HELIOSPHERE AND HELIOSHEATH. IMAP IS BASED ON A COMPLETE AND SYNERGISTIC SET OF OBSERVATIONS. IN SITU AT 1AU, THIS REQUIRES DETAILED OBSERVATIONS OF THE SOLAR WIND ELECTRONS AND IONS SUPRATHERMAL, PICKUP, AND ENERGETIC ION POPULATIONS AND MAGNETIC FIELD. FOR TH

open
Jul 31, 2026Up to $49,410,000

UNINHABITED AERIAL VEHICLE SYNTHETIC APERTURE RADAR OPERATIONS (UAVSAR) 87-12820

open
Sep 30, 2028Up to $52,780,000

RESEARCH AND ANALYSIS (R&A), SOLID EARTH AND NATURAL HAZARDS SCIENCES AND APPLICATIONS

open
Sep 26, 2027Up to $52,240,000

THE ULTRAVIOLET EXPLORER (UVEX)

open
Dec 31, 2026Up to $53,530,000

CLOUDSAT PHASE E MISSION OPERATIONS 88-11198

open
Sep 30, 2026Up to $55,540,000

ORBITING CARBON OBSERVATORY-3 85-16363

open
Sep 30, 2028Up to $54,790,000

RESEARCH AND ANALYSIS (R&A), EARTH SCIENCE ATMOSPHERIC COMPOSITION

open
Sep 26, 2027Up to $58,860,000

COMMERCIAL LUNAR PAYLOAD SERVICES (CLPS) CONTRACT TASK ORDER CS-6.

open
Apr 2, 2030Up to $57,540,000

EXTREME ULTRAVIOLET VARIABILITY EXPERIMENT (EVE) FOR THE SOLAR DYNAMICS OBSERVATORY(SDO)

open
Sep 30, 2027Up to $58,360,000

COMMERCIAL LUNAR PAYLOAD SERVICES (CLPS)TASK ORDER CP-12 CLPS PAYLOADS AND RESEARCH INVESTIGATIONS ON THE SURFACE OF THE MOON

open
Apr 30, 2026Up to $56,930,000

NASA ROSALIND FRANKLIN MISSION PROJECT (40-712104)

open
Sep 30, 2028Up to $62,210,000

MISSION SYSTEMS ENGINEERING AND PAYLOAD AND INSTRUMENT SYSTEMS ENGINEERING SERVICES AS WELL AS GUIDANCE, NAVIGATION, AND CONTROL SYSTEMS SERVICES, WHICH INCLUDES GUIDANCE, NAVIGATION AND CONTROL (GN&C) SYSTEMS ENGINEERING AND ATTITUDE CONTROL SYSTEMS

open
Nov 30, 2028Up to $60,220,000

RESEARCH FACILITIES AND ENGINEERING SUPPORT SERVICES (RF&ESS)

open
Jul 4, 2026Up to $60,540,000

ESCAPE AND PLASMA ACCELERATION AND DYNAMICS EXPLORERS (ESCAPADE) MISSION -.PHASE A CONCEPT STUDY.

open
Aug 31, 2026Up to $65,010,000

IGF::CL,CT::IGF LUCY IS A PLANNED NASA SPACE PROBE THAT WILL TOUR FIVE JUPITER TROJANS, ASTEROIDS WHICH SHARE JUPITER'S ORBIT AROUND THE SUN, ORBITING EITHER AHEAD OF OR BEHIND THE PLANET AND ONE MAIN BELT ASTEROID. ALL TARGET ENCOUNTERS WILL BE FLY-BY ENCOUNTERS.

open
Feb 28, 2034Up to $68,420,000

EUCLID PROJECT 70-16372

open
Sep 30, 2028Up to $70,540,000

NASA AGENCYWIDE COMMUNICATION SERVICES INCLUDING, BUT NOT LIMITED TO, STRATEGIC COMMUNICATIONS/PLANNING/INTEGRATION, STAKEHOLDER RELATIONS/PUBLIC ENGAGEMENT, MEDIA RELATIONS, HISTORY AND ARCHIVES, LIBRARY SERVICES.

open
May 31, 2026Up to $69,060,000

Fission Surface Power System - Technical Library

Yes
Rolling

TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Passive Nutrient Delivery System (PONDS) (KSC-TOPS-81)

Yes
Jul 17, 2026

TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Passive Porous Tube Nutrient Delivery System (KSC-TOPS-73)

Yes
Jul 17, 2026

TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Plasma Processing of Water and Inedible Biomass for pH Control and Nutrient Recycling (KSC-TOPS-94)

Yes
Jul 17, 2026

TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Secure Optical Quantum Communications (LEW-TOPS-108)

Yes
Jul 17, 2026

TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Boosting Quantum Communication Efficiency (LEW-TOPS-178)

Yes
Jul 17, 2026

TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Optical De-Multiplexing Method for QKD Encryption (LEW-TOPS-163)

Yes
Jul 17, 2026

TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Capacitive Micro-Gravity Fluid Mass Gauge (KSC-TOPS-96)

Yes
Jul 17, 2026

TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Coil-On-Plug Igniter for Reliable Engine Starts (MSC-TOPS-105)

Yes
Jul 17, 2026

Commercial Low Earth Orbit (LEO) Development Program Phase 2 Directive Clarifications

Yes
Rolling

Commercial Low Earth Orbit (LEO) Destination Contract (CLDC) Technical Library

Yes
Rolling

TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: RFID Range Extension and Priority Data Forwarding (MSC-TOPS-128)

Yes
Jul 17, 2026

TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Multi-Link Spherical Joint (MSC-TOPS-109)

Yes
Jul 17, 2026

TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Triggering Li-ion Battery Cells with Laser Radiation (MSC-TOPS-99)

Yes
Jul 17, 2026

TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Portable Microscope (MSC-TOPS-131)

Yes
Jul 17, 2026

TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Enhanced Software Suite Maximizes Non-Destructive Evaluation (NDE) Methods (MSC-TOPS-34)

Yes
Jul 17, 2026

TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Coil-On-Plug Igniter for Reliable Engine Starts (MSF-TOPS-105)

Yes
Jul 17, 2026

RESEARCH OPPORTUNITIES IN SPACE AND EARTH SCIENCES (ROSES) 2025

Yes
Sep 9, 2026

CIS Capability Studies IV: Lunar and Mars Communication Architectures (NextSTEP-3: Appendix C)

Yes
Rolling

Near Space Network Services - Contract Award (Subcat 2.2 GEO to Cislunar Relay Services))

Yes
RollingUp to $4,820,000,000

Next Space Technologies for Exploration Partnerships -3 (NextSTEP-3) Omnibus

Yes
Rolling

Research Opportunities for International Space Station (ISS) Utilization

Yes
Sep 30, 2029

Funder Overview

Total Opportunities340
Grants2
Contracts338

Track this funder

Sign up to manage your relationship, add notes, and get notified about new opportunities.

Sign Up Free

Get personalized grant matches

Sign up free to save opportunities, get AI-powered match scores, and manage your applications in one place.

Start Free