ContractopenGARolling
FR 321 Kinzua Creek AOP Replacement (9606175402004011a21fb4dedab51d09)
AGRICULTURE, DEPARTMENT OF > FOREST SERVICEDescription
This is a solicitation for commercial construction for the installation of erosion and sedimentation controls, removal of a 42-inch x 50-inch x 45-foot Corrugated Metal Pipe Arch, and replacing it with a larger pipe designed for aquatic organism passage, along with reconstructing a roadway section.
Interested in this contract?
Start a free 7-day trial to get match scores, track opportunities, and manage proposals with AI.
Contract Details
Value Range
Not specified
Deadline
Rolling (No fixed deadline)
Geographic Scope
GA
Status
open
View the solicitation link
Start a free 7-day trial to open the original listing and solicitation documents, save this contract, and track its deadline. Cancel anytime.
Start free trialSee how well this contract matches your organization.
Get Your Match Score