ContractclosedCA
DESIGN AND BUILD A NEW WATER SUPPLY LINE BETWEEN THE CITY OF PETALUMA WATER DISTRIBUTION SYSTEM AND USCG TRACENS WATER PUMP STATION AT KING ROAD AND BODEGA AVE.
U.S. Coast GuardDescription
DESIGN AND BUILD A NEW WATER SUPPLY LINE BETWEEN THE CITY OF PETALUMA WATER DISTRIBUTION SYSTEM AND USCG TRACENS WATER PUMP STATION AT KING ROAD AND BODEGA AVE. Recipient: J. I. GARCIA CONSTRUCTION, INC. Award Amount: $16.00M
Requirements
Source: USASpending.gov
Interested in this contract?
Start a free 7-day trial to get match scores, track opportunities, and manage proposals with AI.
Contract Details
Value Range
Up to $16,000,000
Deadline
Not specified
Geographic Scope
CA
Status
closed
View the solicitation link
Start a free 7-day trial to open the original listing and solicitation documents, save this contract, and track its deadline. Cancel anytime.
Start free trialSee how well this contract matches your organization.
Get Your Match Score